Laserfiche WebLink
TOLL FREE:(866) 953-1501 <br />9495 N Waldron Rd, Rossville IN, 46065 <br />commercial.acculevel.com <br />DATE BID <br />12/12/22 <br />POINT OF CONTACT <br />Becca Plantz <br />E-MAIL <br />ldbids@ldconstruction.com <br />PROPOSAL SUBMITTED TO <br />City of South Bend <br />PHONE (CELL) <br />574-235-5998 <br />Acct ID # <br />MAILING ADDRESS <br />227 W Jefferson Boulevard <br />South Bend, IN 46601 <br />PROPOSAL SUBMITTED FOR <br />Walker Park Field House <br />2198 S Walnut Street <br />South Bend, IN <br />SCOPE OF WORK: <br />●Acculevel, Inc. will provide the labor, supervision, materials and equipment necessary to install Helical Piers. This quote is based on being <br />able to install 26 Helical piers with a mini excavator and 16 Helical piers with a hand held unit. <br />PRODUCTS: <br />●(42) 2 3/8 -inch O.D., and .190” -inch wall thickness, Helical Pile System: (Helical piles will plain be material). <br />(42) Repair Construction Brackets <br />(42) Helical Lead Sections (7’ length) <br />(84)Shaft Extensions (7’ length) <br />INSTALLATION: <br />●Install helical piles with a hydraulic-powered, rotary-torque drive unit to achieve an estimated ultimate soil capacity per report. Any additional <br />depth on any pile beyond 21’ will be at an additional cost. <br />●Install pile shaft extensions to reach design depth and couple with manufacturer supplied hardware. <br />●Install new construction pile caps and couple with manufacturer supplied hardware. <br />●Monitor and document installation torque for each pile. Installation torque is then used to estimate ultimate soil capacity. <br />●Provide installation data for each pile to the client upon request. <br />ADDITIONAL NOTES: <br />●Acculevel will remove pavers as needed for installation of the helical piers but will not replace the pavers. <br />●Acculevel will call 811 Locates for locations prior to installation. <br />●Acculevel to remove the sidewalk on the West side and grade and seed. <br />●If pile locations must be adjusted in the field, the new locations will be approved by the client prior to pile installation. <br />●An additional charge of $25 per foot on any piling installed over 21 ’ feet deep. <br />●Acculevel, Inc. reserves the right to change the pile configuration and associated costs based upon the results of the load tests. <br />●Proposal is valid for 60 days from the date bid. <br />●Proposal is based upon _1_ mobilization(s) to the job site. <br />●If payment in full, including any additional sums due under this contract or any change order, is not received by Acculevel within 60 days <br />following the last day Acculevel performs work on the jobsite, then Acculevel may exercise its right to file a mechanic’s lien on the property. <br />●If this proposal is not sufficient and Acculevel is required to sign anyone else’s contract then an additional fee of $500 will apply for reviewing <br />the contract. <br />●Proposal includes providing drawings and design of the helical piers by a structural engineer as per our choosing. <br />● <br />EXCLUSIONS: <br />Acculevel, Inc. will not be held responsible for: <br />●Damage to underground utilities. <br />●Marking of proposed pile locations and elevations for the pile <br />caps. <br />●Any excavation or disposal of excavated or debris materials. <br />●Purchase, placement, and compaction of fill soils if needed. <br />●Extra mobilizations by Acculevel, Inc. to the jobsite <br />BID AMOUNT: $74,040 <br />Deposit Due Prior to Mobilization: $0.00 <br />Due Upon Completion: $74,040 <br />All material is guaranteed to be as specified. All work to be completed according to standard practices. Any alteration from above specifications will be executed only upon written orders, and may <br />become an extra charge. All agreements contingent upon accidents or delays beyond our control. Our workers are fully covered by Workmen’s Compensation Insurance. Client assumes all responsibility <br />for damages due to breakage of any hidden fuel/utility lines, though we will do our best to avoid such damage. If payment in full, including any additional sums due under this contract or any change order, <br />is not received by Acculevel within 60 days following the last day Acculevel performs work on the jobsite, then Acculevel may exercise it’s right to file a mechanic’s lien on the property. <br />Authorized Signature:Nolan Beery Date:  12/12/2022    <br />Acceptance of Proposal – The prices proposed, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. We jointly and severally agree to <br />pay you upon completion of the job, and will further pay your service charge of 1-1/3% per month (16% per annum) if account is 30 or more days past due, and your attorney’s fees and costs to collect or <br />enforce this contract. **My signature indicates that I accept the terms of this Proposal. <br />Signature X:Date: