My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Walker Field House Restoration Proj No. 120-010R - Acculevel Commercial Group Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Quotes - Walker Field House Restoration Proj No. 120-010R - Acculevel Commercial Group Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 3:14:51 PM
Creation date
12/13/2022 3:14:33 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 9/29/2021 Page - 8 Public Works Quote <br />Health Act, the Lead-Based Paint Poisoning Prevention Act, the Architectural Barriers Act, and <br />Executive Orders and Department of Labor regulations regarding Equal Employment Opportunity. <br /> <br />XXI. PLANS <br /> <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br /> <br />1. The plans consist of 4 Sheets. <br />2. Attachments: <br />a. FHWA 1273 Required Contract Provisions, Federal Aid Construction Contracts <br />3. The work shall conform to the plans. <br />4. The drawings are schematic in nature. <br />5. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />6. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br />V. M/WBE GOALS <br />A. Prevailing Specifications: City of South Bend Ordinance No. 10761-21, Minority and Women <br />Business Enterprise Inclusion Program Plan <br /> <br />B. Additions: <br /> <br />1. The M/WBE Goals for Division A are: <br />a. MBE 1.4 %. <br />b. WBE 4.7 %. <br /> <br />2. Alternate 1 M/WBE goals are: <br />a. MBE 1.4 %. <br />b. WBE 4.7 %. <br /> <br />3. Complete FORMS MBE-1.0 MBE Utilization Plan and WBE-1.0 WBE Utilization Plan, and submit <br />with Bid Proposal <br /> <br />4. Complete FORMS MBE-2.0 Evidence of Good Faith Efforts and WBE-2.0 Evidence of Good Faith <br />Efforts and submit with Bid Proposal. <br /> <br />5. Complete FORMS MBE-2.1 MBE Contacted and WBE-2.1 WBE Contacted and submit with Bid <br />Proposal. <br />VI. DHPA REQUIREMENTS <br />A. Prevailing Specifications: Secretary of the Interior’s Standards and Guidelines for the Rehabilitation of <br />Historic Properties <br />B. Additions: <br />1. Required federal language. The bid documents (and subsequently the contract documents) must <br />include the following language verbatim: <br />a. This project is funded in part by a grant from the U.S. Department of the Interior, National Park <br />Service’s Historic Preservation Fund Program and is being administered by the Indiana <br />Department of Natural Resources, Division of Historic Preservation and Archaeology. <br />Compliance with all applicable federal, state, and local laws, rules, and regulations is required. <br />b. Compliance with the applicable Secretary of the Interior’s Standards and Guidelines is <br />required. <br />c. The Indiana Department of Natural Resources, the Indiana State Auditor, the U.S. Department
The URL can be used to link to this page
Your browser does not support the video tag.