My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Multi-Component Striping Proj No. 122-065 - NO QUOTES
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Quotations/Proposals
>
Opening of Quotes - Multi-Component Striping Proj No. 122-065 - NO QUOTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 3:14:32 PM
Creation date
12/13/2022 3:14:27 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 9/29/2021 Page - 6 Public Works Quote <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br /> <br />XIX. PAVEMENT TRAFFIC MARKINGS <br />A. Prevailing Specifications: 2022 INDOT Standard Specifications Section: 808 <br />B. Additions: <br />1. Work to be performed shall include all labor, services, materials, insurance and equipment to apply <br />pavement markings as shown in the plans. <br />2. All pavement markings on concrete shall be multi-component (epoxy). All pavement markings shall <br />be in accordance with INDOT Standard Specifications Section 808. <br />3. The material shall be warranted to retain its color and adherence to the pavement for 180 days <br />from substantial completion. <br />4. All pavement markings shall be in accordance with the Indiana MUTCD. <br />5. Removal of existing conflicting pavement striping shall be done by water blasting only. All costs for <br />removal of existing striping shall be incidental. <br />6. Measurement and Payment <br />a. Payment for all costs of installing pavement markings, including the cost of all materials, <br />equipment, tools, labor, transportation, operations, and all other incidentals, shall be paid for <br />on a linear foot or each basis under the pay items: <br /> <br />LINE, MULTI-COMPONENT, SOLID, WHITE, 4 IN……………………………………………………...LFT <br />LINE, MULTI-COMPONENT, SOLID, YELLOW, 4 IN…………………………………………………...LFT <br />LINE, MULTI-COMPONENT, BROKEN, WHITE, 4 IN…………………………………………………..LFT <br />LINE, MULTI-COMPONENT, YIELD LINE CHEVRON………………………………………………….LFT <br />LINE, MULTI-COMPONENT, DOTTED, WHITE, 4 IN...………………………………………………...LFT <br />TRANSVERSE MARKING, MULTI-COMPONENT, SOLID, YELLOW, CROSSHATCH 8 IN………LFT <br />TRANSVERSE MARKING, MULTI-COMPONENT, CROSSWALK LINE, WHITE, 24 IN……………LFT <br />PAVEMENT MESSAGE MARKING, MULTI-COMPONENT, LANE INDICATION ARROW……...EACH <br />TRANSVERSE MARKING, MULTI-COMPONENT, SOLID, WHITE, CROSSHATCH 8 IN…………LFT <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.