Laserfiche WebLink
Butler NJ Butler Township <br />Snderson & Denzler Assoc <br />Bill Ryden <br />NWMCC was the general contractor on a <br />rehabilitation contract. NWMCC installed <br />approximately 6 liners and 253 MtM of 8" <br />Liner 6 2015 253.00 <br />3_Complete <br />Cranford NJ City of Cranford Sandra Installed 72' 2015 72.00 3_Complete <br />Franklin Township NJ Franklin Township <br />CME Associates: Joseph Gemmell, P.E. <br />3141 Bordentown Ave Prlin, NJ <br />732-727-8000 <br />Installation of 10 CIPP Point Repairs <br />Installation of 1,300 LF of MTM 10 2015 1,300.00 <br />3_Complete <br />Green Brook NJ Township of Green Brook <br />Maser Consulting <br />Ronald Madison: 610-868-4201 <br />Sanitary sewer repairs and re-lining of <br />various 8" sanitary sewer mains. 10 2015 993.00 <br />3_Complete <br />Paterson NJ City of Paterson <br />Montana Construction: Mike <br />80 Contant Ave, Lodi, NJ 07644 <br />(973) 478-5200 Installation of 215LF of MTM 2015 1,003.00 <br />3_Complete <br />South Orange NJ South Orange MTM Lining 2015 300.00 3_Complete <br />Union NJ Township of Union <br />Reivax Contracting <br />Luis Santana: 973-817-5553 <br />Installed 7 Sectional CIPP Repairs and <br />1,402 of full segment liners 7 2015 1,575.00 <br />3_Complete <br />Roslyn NY Village of Roslyn Sam Dalipinski: 516-204-3469 <br />Installation of 13,500 LF of 8" to 10" MH to <br />MH Sanitary Sewer lining 2015 26,130.00 <br />3_Complete <br />Suffolk County NY Suffolk Couny <br />Suffolk County Town of <br />Ralph Sergio 631-854-4901 MTM Lining 2015 813.00 <br />3_Complete <br />Suffolk County NY Suffolk Couny <br />Suffolk County Town of <br />Ralph Sergio 631-854-4902 Installed 4 CIPP Repairs 4 2015 <br />3_Complete <br />Goshen NY Village of Goshen <br />Lanc & Tully: Dawn Kalisky <br />P.O. Box 687 Rt 207 <br />Goshen, NY 10924 <br />845.294.3700 Installed 24 CIPPs & 750Lf of MtM Lining 24 2015 750.00 <br />3_Complete <br />Green Castle PA Greencastle Township Pa <br />Sub Contractor to Video Pipe Services Greg <br />Stevenson - 856-697-1900 MTM Lining Various areas 8" - 12" 2015 1,649.00 <br />3_Complete <br />Lehigh County PA Lehigh County Authority <br />Jason Gruber <br />Manager Distribution & Collections <br />Lehigh County Authority <br />1242 Martin Luther King Jr Dr. <br />Allentown, Pennsylvania 18102 <br />JasonGruber@lehighcountyauthority.org <br />610-437-7646, ext. 753 MTM Lining 2015 2,155.00 <br />3_Complete <br />Norristown PA City of Norristown <br />SSM Group <br />Jim Carr: 610-621-2000 <br />Installation of 61 spot repairs in 8" to 24" <br />line totaling over 450 linear feet 8" 2015 450.00 <br />3_Complete <br />Montvale NJ Town of Montvale <br />Maser Consulting: Paul S. Niehoff, P.E. <br />973-398-3110 Installation of 825LF 2014 825.00 <br />3_Complete <br />Totowa NJ Township of Totowa <br />Alaimo Group Consulting Engineers <br />Nordam Murphy, P.E.: 973-523-6200 <br />Fax: 973-523-1765 <br />MH to MH- 510 FT 15" <br />175 FT 8" 2014 685.00 <br />3_Complete <br />Northport NY Village of Northport <br />Gannett Fleming Engineering <br />Nathan Wheeler: 516-364-4140 x1322 <br />Installation of 3,180 LF of MH to MH Lining <br />in 8" - 10" Sanitary Sewer Mains. Installed <br />15 - 6 ft Sectional CIPP Repairs 10" 2014 3,180.00 <br />3_Complete <br />Oyster Bay NY Oyster Bay Sewer Authority <br />H2M Engineering <br />Steve Hearl: 631-756-8000 Ext: 1510 Installed 28 CIPPs and 170FT Main Lining 8" 2014 170.00 <br />3_Complete <br />Port Jefferson NY Town of Port Jefferson <br />Ralph Sergio: 631-854-4901 <br />Email: ralph.sergio@suffolkcountyny.gov <br />Installation of 1900 LF of 8" sewer main <br />and 450 LF of 12" sewer main. Installation <br />of 2 - 6ft Sectional CIPPs 8" 2014 2,350.00 <br />3_Complete <br />Clark Summit PA Borough of Clark Summit <br />Robert P. Naegele, P.E: 570-586-5091 <br />Fax: 570-586-5073 <br />Point repairs- 15 / 5FT Repairs <br />3/ 6 FT Repairs <br />1/ 8 FT Repair <br />200 FT additional lining <br />MH TO MH - 256 FT 8" <br />135 FT 10" 8" 2014 391.00 <br />3_Complete <br />Dover NJ Dover Board of Education Jonathan R. Tardiff P.E, C.M.E., Engineer Installed 450 ft 8" CIPP Sewer Main 2013 450.00 <br />3_Complete <br />Fort Dix NJ Fort Dix <br />Rome Management Associates <br />Judy Brooks: 609-393-7600 <br />Installed 7,400' linear feet of 8" and 12" <br />liner 2013 7,400.00 <br />3_Complete <br />Hanover NJ <br />Hanover Sewerage <br />Authority <br />Hatch Mott MacDonald <br />Robert Haller: 973-912-2538 <br />Fax: 973-912-2455 <br />Installation of 1200LF of MH to MH Lining <br />8" Main. Installation of 2 - 6ft Sectional <br />CIPPs 2 2013 1,200.00 <br />3_Complete <br />Hasbrouck Heights <br />NJ <br />Borough of Hasbrouck <br />Heights Job & Job Engineering: 201-487-8754 Installed 750' of 8 inch CIP Sewer Main 2013 750.00 <br />3_Complete <br />Bronxville NY Yonkers, NY Mike May: 914-337-1312 Installed 1,000' of 8" liner 8"2013 1,000.00 3_Complete <br />May Brook <br />NY May Brook Township <br />DeWinter Engineering <br />Jim DeWinter: 845-888-2722 <br />Installation of 2200' of 8" & 10" CIP Sewer <br />Main 8" 2013 2,200.00 <br />3_Complete <br />Syosset NY Town of Oyster Bay <br />BDG Construction Corp <br />Anthony Galu: 516-624-1979 Installed 150' 8 inch CIP Pipe 8" 2013 150.00 <br />3_Complete