My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Nexus Center Roof Replacement Proj No. 121-064A - Midland Engineering Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - Nexus Center Roof Replacement Proj No. 121-064A - Midland Engineering Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 3:12:52 PM
Creation date
12/13/2022 3:11:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
June 20, 2013 <br />To; Midland Engineering Co, <br />Attn; Ken Sage NST <br />52369 S,It, 933 N, ������ ��L <br />South fiend, IN 46637 <br />From; Jeremy D. Waller �------ <br />Director of Operations ` AN W <br />Niles Steal Tank Company (NST) Mes /are <br />1701-A Terminal Rd, <br />Niles, MI 49120 <br />Dear Inti-, Sage, <br />I am waiting this letter with respect to the work that has teen completed by Midland Etigincoring Company <br />on the NST facility rpt the address listed above. Our current fuWty was constructed In 1969 and has gone <br />through niaW upgrades and revisions since its Inception Of the 100,000 square foet of maaufaetuning aces. <br />wo cunentiy have wider roof all has been through Its share of upgrades, All of 06 except, of course, the <br />rooting system, <br />We began the task of completing the new roof with Midland Engineering Company in 2011 and as of this <br />letter date we are finally finished witty all renovations to the roofing system, T will say that Midland <br />Engineering Company has been one of the best partners I have been Involved with on such a large seale, <br />and long term, project <br />I would like to commend Midland Ngineering Company on its communication skills, T was aware of <br />every aspect of this project from start to finish and truly felt comfortable with each step of the process. From <br />the otfiee perswinol to the field technicians, It was truly demonshuted that Midland luw not only the <br />experience and quality to eamplete the jobs on time, but to keop all key personnel involved through the <br />entirety of lire project, All personnel I have had contact with at Midland were kind, infbrmadvo, <br />prAsslonal and extremely knowledgeable, <br />Mr. Sage, thank you for assisting NST with our roofing system upgrade and feel figs to utilize me as a <br />reference anytimo, It was apleasura partnering with Midland ffigineering Company and we'll look to you <br />ogaln when the need arises, <br />Most Sincerely_,,,, <br />Jeremy D. Walter <br />Director of Operations/Quality Control Manager <br />Niles Steel Tank Company <br />A Sunlow o"^`"Y titt�Y <br />170-1-A 2brMAIal Rd o PO, Bav 728 • Mks, A1Icb/gan 49120 s 269.683.1910. mX, 269,683,19,53 1 ►r'a8 &A,11110ahcoin <br />
The URL can be used to link to this page
Your browser does not support the video tag.