Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Nexus Center Roof Replacement <br />Project Number: <br />For Bids Due: <br />121-064A <br />December 13, 2022 <br />Contractor Name: Midland Engineering Company, Inc. <br />ALTERNATE #3 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />SECTION 3B: Repair existing metal roof <br />8 <br />as necessary. This area has existing 6" <br />1 <br />LS <br />7 <br />fiberglass insulation with vinyl cover. <br />1 <br />LS <br />30,600.00 <br />5 <br />This roof is a 2/12 slope and it is <br />1 <br />LS <br />4,000.00 <br />supported by a PEMB (pre-engineered <br />metal building) system. <br />ALTERNATE #3 TOTAL 4,000.00 <br />ALTERNATE #4 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />SECTION 3C: Replace existing rusted <br />8 <br />metal roof with a new metal roof system <br />1 <br />LS <br />7 <br />as necessary. This area has existing <br />1 <br />LS <br />30,600.00 <br />6 <br />fiberglass insulation with vinyl cover <br />1 <br />LS <br />19,800.00 <br />underneath the existing metal roof. This <br />roof is over pre-engineered metal <br />building PEMB) system. <br />ALTERNATE #4 TOTAL 19,800.00 <br />ALTERNATE #5 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />8 <br />SECTION 3D: Repair existing metal roof <br />1 <br />LS <br />7 <br />as necessary. <br />1 <br />LS <br />30,600.00 <br />Replace, recoat with a spray -on <br />membrane ors of repair. <br />ALTERNATE #5 TOTAL 30,600.00 <br />ALTERNATE #6 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />8 <br />SECTION 4A: Demolish existing metal <br />1 <br />LS <br />roof. <br />71,700.00 <br />ALTERNATE #1 TOTAL 71.700.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 8 <br />