My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Martin Luther King Jr. Center Demolition Proj No. 121-066 - Green Demolition Contractors, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - Martin Luther King Jr. Center Demolition Proj No. 121-066 - Green Demolition Contractors, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 3:11:07 PM
Creation date
12/13/2022 3:08:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Rockford Coustructiom <br />Grand Rapids, Ml 49508 <br />Brock Burgess <br />616-437-4226 <br />LaPorte, In <br />Meijer Store <br />Scope of Work. <br />GREEN DEMOLITION! CONTRACTORS, INC. <br />523 Northbrook Drive <br />Michigan City, IN 46360 <br />312-409-4771 office <br />S 787, 000 00 <br />Complete 100% gut re -habilitation project with Bobcat machines of an existing Big Pox facility <br />consisting of ceilings, drywall partition walls, storefronts, facades, floorings, concrete removals. <br />KEY. and portion of structure removals. <br />Tenn & Blank Construction LLC <br />1623 Greenwood Ave. <br />Michigan City, IN 46360 <br />Joel Gonzales <br />219 877-8174 <br />Uptoivn AHis tLofis $ 611,086.00 <br />Michigan City, IN <br />Scope of Work. <br />Interior Selective Finish / Abatement and Structural removals of Multi Level Facility <br />Barton Malow Company <br />150 N Upper Wacker Br 41650 <br />Chicago, IL 60606 <br />Brian Courtney <br />312-281-0821 <br />Argonne National Laboratory $ 212,000.00 <br />Argonne National Lab — MI/eHals Engineering Building 370 <br />Building 360 Expansion <br />Scope of Work: <br />Green Demolition performed wreck removals within Building 370 adjacent to an ongoing <br />Phosphorous Experiment working in direct conjunction with electric, communications systems, <br />sprinkler systems, natural gas and steam while performing lead and asbestos abatement. Green <br />Demolition performed a Building Wreck within 10 feet of a Linear Accelerator without service <br />interruptions to the electric, water, sewer, natural gas, steam and communications systems. <br />'4 g <br />
The URL can be used to link to this page
Your browser does not support the video tag.