My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2022 Curb and Sidewalk Construction, Round II Proj No. 122-044 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - 2022 Curb and Sidewalk Construction, Round II Proj No. 122-044 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 3:05:55 PM
Creation date
12/13/2022 3:03:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name: <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />MIMMI G <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />2022 Curb and Sidewalk Construction — Round 2 ' <br />122-044 <br />December 13th, 2022 <br />Selge Construction Co., Inc. <br />Item <br />No. <br />, Description <br />Q <br />Unit <br />Unit Price <br />Total <br />Amount <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />230 <br />SY <br />$ 111.50 <br />$ 25,645.00 <br />2 <br />CONCRETE SIDEWALK, 4 -IN <br />230 <br />SY <br />$ 138.00 <br />$ 31,740.00 <br />3 <br />CONCRETE CURB, REMOVE <br />225 <br />LF <br />$ 72.00 <br />$ 16,200.00 <br />4 <br />CONCRETE CURB, MODIFIED <br />225 <br />LF <br />$ 91.75 <br />$ 20 643.75 <br />5 <br />CONCRETE APPROACH, REMOVE <br />10 <br />SY <br />$ 100.00 <br />$ 1,000.00 <br />6 <br />GRAVEL APPROACH, REMOVE <br />20 <br />SY <br />$ 15.00 <br />$ 300.00 <br />9 <br />PCCP FOR APPROACHES, 6 -IN <br />30 <br />SY <br />$ 179.00 <br />$ 5,370.00 <br />10 <br />CURB RAMP, REMOVE <br />15 <br />SY <br />$ 100.00 <br />$ 1,500.00 <br />11 <br />PAIRED PERPENDICULAR CURB RAMP <br />15 <br />SY <br />$ 306.00 <br />$ 4,590.00 <br />12 <br />TOPSOIL AND SEEDING <br />385 <br />SY <br />$ 31.75 <br />$ 12 223.75 <br />13 <br />TREE, REMOVE, 48 -IN <br />1 <br />EA <br />$ 3,325.00 <br />$ 3,325.00 <br />14 <br />PLANT, DECIDUOUS TREE, SINGLE STEM, <br />2 -IN TO 2.5 -IN <br />2 <br />EA <br />$ 1,525.00 <br />$ 3,050.00 <br />Bidder (Firm): <br />Address: <br />City/State/Zip: <br />DIVISION 5 TOTAL $ 125,587.50 <br />Construction Co., Inc. <br />2833 S. 11th St <br />Niles, MI 49120 Telephone Number: ( 269 ) 684-0842 <br />Byt <br />(Signature) <br />Justin Butler, Vice President <br />(Printed Name of Person Signing) <br />Version 09/29/2021 Contractor's Bid for Public Works - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.