Laserfiche WebLink
Description: <br />JA Drive & Lexington Streetscapes (629) — Owner: City of Elkhart. Complete reconstruction <br />of the streets including new underground utilities, decorative sidewalk and new streetlights. <br />$1,987,254.00 Completed: 2020 <br />Description: <br />Wawasee Conklin Bay Trail (633) — Owner: Syracuse-Wawasee Park Foundation. Installation <br />of 1,700 LF of boardwalk and 2,500 LF of 10 concrete pathways. $2,254,710.00 Completed: <br />2020 <br />Description: <br />CR 46 RR Crossing SS Repair (638) — Owner: New Paris Conservancy District. Installation of <br />sanitary sewer beneath the railroad crossing. $248,929.00 Completed: 2020 <br />Description: <br />Laurel Road Trail Construction (639) — Owner: City of South Bend. Installation of concrete <br />pathway. $120,352.75 Completed: 2020 <br />Description: <br />2020 Concrete Repair (640) — Owner: City of Goshen. Removal and replacement of concrete <br />pavement patches at various locations in Goshen. $905,050.00 Completed: 2020 <br />Description: <br />Brandywine High School Tennis Courts (646) — Owner: Brandywine Community Schools. <br />Installation of new tennis courts including all site work. $500,000.00 Completed: 2020 <br />Description: <br />Press Ganey Concrete Replacement (647) — Owner: PAI Properties, LLC. Removal of existing <br />parking lot and replacement with concrete pavement. $223,000.00 Completed: 2020 <br />Description: <br />Hydrant Replacement (648) — Owner: City of South Bend. Removal and relocation of 6 fire <br />hydrants. $62,727.00 Completed: 2020 <br />Description: <br />Prairie Creek Run Phase II Water Services (656) — Owner: Elkhart Highway Dept. <br />Installation of 13 new water services. $173,678.00 Completed: 2020 <br />Description: <br />Steuben Lakes Pump 1 (660) — Owner: Steuben Lakes Regional Waste District. Installation of <br />new lift station and associated bypass pumping. $185,550.00 Completed: 2020 <br />Description: <br />Zigler/Filbert Street Improvements (663) — Owner: Town of New Carlisle. Installation of new <br />water main, storm sewers and road reconstruction. $753,811.00 Completed: 2020 <br />