My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2022 Curb and Sidewalk Construction, Round II Proj No. 122-044 - Selge Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - 2022 Curb and Sidewalk Construction, Round II Proj No. 122-044 - Selge Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 3:05:55 PM
Creation date
12/13/2022 3:03:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SLUSSERS <br />SPECIAL CONDITIONS <br />Concerning the Attached Quotation <br />Quote Number: SBcrubrd2 <br />STANDARD NOTATIONS: <br />1. Special note concerning seeding: Slusser's will install seed year-round. However, we will not guarantee <br />seeding performed May 15th through August 15th, and October 1 through March 1. Seeding during this <br />period is very risky due to extreme climatic conditions (heat/drought/cold/etc.) This note does not apply <br />to prairie or wetland seeding unless specified otherwise. <br />2. This quote is valid for a period of 60 days. <br />3. Lawn maintenance to include mowing or spraying is not included in this quotation. <br />4. Topsoil, topsoil placement and any necessary amendments are not included in this quotation. <br />5. Quantities on this quotation are approximate. Areas will be measured and invoiced per unit prices. <br />6, Performance & Payment bonds are available but not included in this quotation. <br />7. Clearing, grubbing, removal of rocks, debris and existing vegetation is not included in this quotation. <br />S. Inorganic and Organic soil amendments are not included in this quotation. <br />9. Supplying or Installing topsoil, planting soil, or engineering soil is not included in this quotation. <br />10. Seeding price includes 100% Kentucky Bluegrass lawn mix, fertilizer, straw mulch, and watering for 30 days <br />per specification only. Topsoil, topsoil placement, or erosion blanket is not included in this price. <br />11. Tree price includes supplying and installing 2" - 2.5" Caliper size tree from the pre -approved tree list, <br />staking, hardwood mulch, watering for 30 days, and 7 year warranty. <br />12. Maintenance or warranty bond for seeding or trees is not included in this quotation. <br />13. Steel edging or weed barrier is not included in this quotation. <br />14. Indiana State Sales Tax has not been included in pricing. <br />15. Traffic control Is the responsibility of the contractorlowner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.