Laserfiche WebLink
CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR'S BID FOR PUBLIC WORK <br />Project Name 2022 Curb and Sidewalk Construction — Round 2 <br />Project No. <br />For Bids Due <br />122-044 <br />December 131', 2022 <br />PART I <br />(Must be completed for all bids. Please type or print) <br />Date: December 13, 2022 Bidder (Firm): Rieth-Riley Construction Co., Inc. <br />Address: 25200 State Road 23 <br />City/State/Zip: South Bend, IN 46614 Telephone Number: ( 574 ) 288-8321 <br />Agent of Bidder (if Applicable): Rieth-Riley Construction Co., Inc. <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br />2022 Curb and Sidewalk Construction — Round 2 <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />City of South Bend Department of Public Works, Division of Engineerin <br />and dated December 13, 2022 for the sum of (enter the Total <br />/Bid �a)s shown on the Proposal) <br />A <br />(Enter sum of Total Base Bfd plus Alternates shown 6h Proposal) n (Numerical) <br />d � *)I � a <br />The undersigned further agrees to furnish a bond or certified check with this bid for an amount specified in <br />the notice of the letting. If alternative bids apply, the undersigned submits a proposal for each in accordance <br />with the notice. Any addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that <br />shown in the original contract if accepted by the City of South Bend. If the bid is to be awarded on a unit <br />basis, the itemization of the units shall be shown on eo rate at_tachment. <br />By <br />(Signature) <br />Ruben Alvarado, Sales Manager <br />(Printed Name of Person Signing) <br />The above bid is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Elizabeth A. Maradik, President <br />Gary A. Gilot, Member <br />ACCEPTANCE <br />day of <br />20 <br />Joseph R. Molnar, Vice President <br />Jordan V. Gathers, Member <br />Murray L. Miller, Member Attest: Theresa Heffner, Clerk <br />Version 09/29/2021 Contractor's Bid for Public Works - 2 <br />