My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCA - Airport Annexation Area Water Main Extension Proj No. 120-026 - G.E. Marshall, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Project Completion Affidavits
>
PCA - Airport Annexation Area Water Main Extension Proj No. 120-026 - G.E. Marshall, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 3:06:55 PM
Creation date
11/22/2022 3:06:39 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENVIRONMENTAL SERVICES <br /> <br /> <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Theresa Heffner, Clerk <br />FROM: Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: 120-026 Airport Annexation Area Water Main Extension <br />Agenda Request – Final Completion Affidavit <br />DATE: November 14, 2022 <br /> <br />The Division of Engineering and Division of Utilities request the Board of Public Works approval of <br />the Project Completion Affidavit for Project No. 120-026 Airport Annexation Area Water Main <br />Extension. <br /> <br />Included are the following documents for closeout: <br /> <br /> Project Completion Affidavit <br /> Maintenance Bond <br /> Final Waiver of Lien <br /> <br />Summary of Project – Final Costs: <br /> <br /> Original Contract Price $313,196.40 <br /> Change Orders (Net Deduct) ($ 75,740.30) <br /> Change Orders, Percentage Change (24.18%) <br /> Final Contract Price: $237,456.10 Under Budget <br /> <br />This project resulted in completion under budget as a result of a field change that allowed for <br />the water main to be installed south of existing utilities along US 20 and outside of the shoulder <br />area that would have been impacted by the original alignment for the water main. The savings <br />for this project were the result of lower hot mix asphalt, tack coat, and compacted aggregate <br />materials that did not need to be installed. This resulted in both material and labor savings on <br />the project. <br /> <br />This water main will serve the new South Bend Chocolate Company and Dinosaur Museum site <br />at the intersection of US 20 and Olive Road. <br /> <br />Closeout documents are submitted for approval at the 11/22/2022 Board of Public Works <br />Meeting. For questions regarding the subject agenda request, contact Jacob M. Klosinski (Ext. <br />9496) at the Division of Engineering.
The URL can be used to link to this page
Your browser does not support the video tag.