My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 4 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinf. Imprvmts. Proj No. 119-069A - Bowen Engieering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order No 4 - WWTP Final Clarifiers 4-5, Aeration Tanks 1-4, & Disinf. Imprvmts. Proj No. 119-069A - Bowen Engieering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 3:04:43 PM
Creation date
11/22/2022 3:04:34 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 1 of 1 <br /> <br /> <br /> 8802 North Meridian Street • Indianapolis, IN 46260 • 317.842.2616 phone • www.BowenEngineering.com <br /> <br />October 31,2022 <br /> <br />(E-Mail) <br />Benjamin Burroughs <br />Water Resource Engineer <br />Arcadis U.S., Inc. <br />150 West Market Street Suite 278 <br />Indianapolis, IN 46204 <br /> <br />RE: South Bend WWTP Upgrades <br />Bowen Project #15-21-008 <br />RE: RFQ-020 – Aeration Gate Bulkheads <br /> <br />Dear Mr. Burroughs: <br /> <br />The Aeration gates were leaking into the backside channel bulks heads were required to isolate the aeration tanks. <br />Work was tracked on a T&M basis. See associated costs below. <br /> <br />Labor/Equipment: $7,080.00 <br />Material: 0.00 <br />Markup: $1,062.00 <br />Bonds/Insurance: $81.00 <br /> <br />Total Price: $8,223.00 <br /> <br />We look forward to the opportunity to review this proposal with you. If you have any questions regarding this <br />proposal, feel free to contact me at 219-746-7165. <br /> <br /> <br />Sincerely, <br />BOWEN ENGINEERING CORPORATION <br /> <br /> <br />Patrick Stanford <br />Project Manager
The URL can be used to link to this page
Your browser does not support the video tag.