My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - WWTP Final Clarifiers 1-3 Improvements Proj No. 119-069B - Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Opening of Bids
>
Opening of Bids - WWTP Final Clarifiers 1-3 Improvements Proj No. 119-069B - Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 2:53:40 PM
Creation date
11/22/2022 2:51:45 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/22/2022
Rectangle
ID:
1
Creator:
Created:
11/22/2022 2:53 PM
Modified:
11/22/2022 2:53 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
03029045.0000 00 41 13-25 <br />For each proposed unnamed (write-in) equipment/supplier alternate, Bidder shall submit <br />with its Bid one set of drawings, specifications, complete descriptive material, a detailed <br />listing of proposed equipment, and other information, including, but not limited to, the <br />following: <br />1. Dimensional and weight information on components and assemblies. <br />2. Catalog information. <br />3. Manufacturer’s specifications, including materials descriptions and paint systems <br />descriptions. <br />4. Complete listing of requested exceptions to the requirements of the Contract <br />Documents. <br />5. Performance data. <br />6. Horsepower of all motors. <br />7. Utility requirements (water, electric power, air, etc.). <br />8. Address and phone number of nearest parts/repair service centers and nearest <br />manufacturer’s representative. <br />9. A listing of the three most recent installations where similar equipment by the <br />manufacturer is currently in service, including contact names and telephone numbers for <br />the Owner and installation Contractor. <br />10. Written description and drawings regarding all changes and modifications to the work <br />necessary to adapt the equipment to the arrangements shown or function described in <br />the Contract Documents. <br />11. Time of delivery. <br />C. Base Bid Materials and Equipment Schedule <br />The Bidder affirms that the Lump Sum Bid above is based upon the Named <br />Manufacturers/System Integrator below whose names are circled: <br />Section <br />Number Section Title Manufacturer <br />Alternate <br />Deduct <br />46 43 23 Circular Clarifier <br />Equipment <br />(A) WesTech Engineering <br />(A) OVIVO, Inc. <br />XXXXX <br />XXXXX <br />ARTICLE 6 – TIME OF COMPLETION <br />6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready <br />for final payment in accordance with Paragraph 15.06 of the General Conditions on or <br />before the dates or within the number of calendar days indicated in the Agreement. <br />6.02 Bidder accepts the provisions of the Agreement as to liquidated damages and special <br />damages in the event of failure to complete the Work within the Contract Times. <br />ARTICLE 7 – ATTACHMENTS TO THIS BID <br />7.01 The following documents are attached to and made a condition of this Bid:
The URL can be used to link to this page
Your browser does not support the video tag.