Laserfiche WebLink
Section II: Plan and Equipment Questionnaire <br />1.Plan or layout for performing proposed work: <br />The proposed jobsite was inspected by one of our Contract Managers during the <br />pre-bid or prior to the bid submittal . During a jobsite visit, attention is directed to <br />the existing conditions and site access. Bowen Engineering Corporation will <br />provide additional information upon request. <br />W e intend to construct the job as follows: <br />a)Install Dewatering System <br />b)Isolate existing Clarifiers 1-3 <br />c)Perform in-tank demolition <br />d)Install underslab Auger Cast Piles & Piping <br />e)Perform in-tank cast-in-place concrete <br />f)Install process equipment <br />g)General Construction – finish work <br />h)Start-up <br />i)Compliance with all OSHA standards and requirements and Bowen Engineering <br />Corporation’s Safety Policy.