Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME: South Bend Neighborhood Infrastructure Project - Longfellow Ave <br />and South Street Intersection <br />PROJECT NO. 121-048B <br />FOR BIDS DUE: November 22, 2022 <br />CONTRACTOR NAME: Milestone Contractors North, Inc. <br />Base Bid <br />Addendum No. 1 <br />0 <br />�.0 <br />tress _ - <br />Item No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />2,600.00 <br />$2,600.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />15,070.00 <br />$15,070.00 <br />3. <br />Maintenance of Traffic <br />1 <br />LS <br />15,200.00 <br />$15,200.00 <br />4. <br />Temporary Erosion Control <br />1 <br />LS <br />800.00 <br />$800.00 <br />5. <br />Clearing Right of Way <br />1 <br />LS <br />16,900.00 <br />$16,900.00 <br />6. <br />Concrete Curb, Remove <br />650 <br />LFT <br />23.00 <br />$14,950.00 <br />7. <br />Concrete Pavement, Sidewalk, Approaches, Remove <br />350 <br />SYD <br />28.00 <br />$9,800.00 <br />8. <br />Drainage Structure, Remove <br />1 <br />EA <br />500.00 <br />$500.00 <br />9. <br />Pipe, Remove <br />20 <br />LFT <br />41.00 <br />$820.00 <br />10. <br />Common Excavation <br />880 <br />CYD <br />74.00 <br />$65,120.00 <br />11. <br />B Borrow <br />265 <br />CYD <br />74.00 <br />$19,610.00 <br />12. <br />Structure Backfill (Undistributed) <br />100 <br />CYD <br />15.00 <br />$1,500.00 <br />13. <br />Compacted Aggregate, No. 53 <br />320 <br />TON <br />43.00 <br />$13,760.00 <br />14. <br />HMA Surface, 9.5 mm, Type B, 1.5" <br />80 <br />TON <br />241.00 <br />$19,280.00 <br />15. <br />HMA Intermediate, 12.5 mm, Type B, 2.5" <br />135 <br />TON <br />152.00 <br />$20,520.00 <br />16. <br />HMA Base, 25.0 mm, Type B, 4" <br />215 <br />TON <br />124.00 <br />$26,660.00 <br />17. <br />Concrete Curb, 6" <br />730 <br />LFT <br />68.00 <br />$49,640.00 <br />18. <br />Concrete Curb and Gutter, Type A <br />45 <br />LFT <br />97.00 <br />$4,365.00 <br />19. <br />PCCP for Approaches, 6" <br />190 <br />SYD <br />112.00 <br />$21,280.00 <br />20. <br />Concrete Sidewalk, 4" <br />380 <br />SYD <br />99.00 <br />$37,620.00 <br />21. <br />Concrete Curb Ramp <br />60 <br />SYD <br />220.00 <br />$13,200.00 <br />22. <br />Sodding <br />1,075 <br />SYD <br />26.80 <br />$28,810.00 <br />23. <br />Tree, 2.5" <br />53 <br />EA <br />625.00 <br />$33,125.00 <br />24. <br />Casting, Adjust to Grade <br />5 <br />EA <br />1,600.00 <br />$8,000.00 <br />25. <br />Valve, Adjust to Grade <br />4 <br />EA <br />360.00 <br />$1,440.00 <br />26. <br />Storm Sewer Manhole, 48" <br />1 <br />EA <br />4,900.00 <br />$4,900.00 <br />27. <br />Storm Sewer Inlet, 30" <br />3 <br />EA <br />3,400.00 <br />$10,200.00 <br />28. <br />Storm Sewer Pipe, 12" <br />175 <br />LFT <br />61.00 <br />$10,675.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />