BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />PROJECT NAME: South Bend Neighborhood Infrastructure Project - Longfellow Ave
<br />and South Street Intersection
<br />PROJECT NO. 121-048B
<br />FOR BIDS DUE: November 22, 2022
<br />CONTRACTOR NAME: Milestone Contractors North, Inc.
<br />Base Bid
<br />Addendum No. 1
<br />0
<br />�.0
<br />tress _ -
<br />Item No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />1
<br />LS
<br />2,600.00
<br />$2,600.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />15,070.00
<br />$15,070.00
<br />3.
<br />Maintenance of Traffic
<br />1
<br />LS
<br />15,200.00
<br />$15,200.00
<br />4.
<br />Temporary Erosion Control
<br />1
<br />LS
<br />800.00
<br />$800.00
<br />5.
<br />Clearing Right of Way
<br />1
<br />LS
<br />16,900.00
<br />$16,900.00
<br />6.
<br />Concrete Curb, Remove
<br />650
<br />LFT
<br />23.00
<br />$14,950.00
<br />7.
<br />Concrete Pavement, Sidewalk, Approaches, Remove
<br />350
<br />SYD
<br />28.00
<br />$9,800.00
<br />8.
<br />Drainage Structure, Remove
<br />1
<br />EA
<br />500.00
<br />$500.00
<br />9.
<br />Pipe, Remove
<br />20
<br />LFT
<br />41.00
<br />$820.00
<br />10.
<br />Common Excavation
<br />880
<br />CYD
<br />74.00
<br />$65,120.00
<br />11.
<br />B Borrow
<br />265
<br />CYD
<br />74.00
<br />$19,610.00
<br />12.
<br />Structure Backfill (Undistributed)
<br />100
<br />CYD
<br />15.00
<br />$1,500.00
<br />13.
<br />Compacted Aggregate, No. 53
<br />320
<br />TON
<br />43.00
<br />$13,760.00
<br />14.
<br />HMA Surface, 9.5 mm, Type B, 1.5"
<br />80
<br />TON
<br />241.00
<br />$19,280.00
<br />15.
<br />HMA Intermediate, 12.5 mm, Type B, 2.5"
<br />135
<br />TON
<br />152.00
<br />$20,520.00
<br />16.
<br />HMA Base, 25.0 mm, Type B, 4"
<br />215
<br />TON
<br />124.00
<br />$26,660.00
<br />17.
<br />Concrete Curb, 6"
<br />730
<br />LFT
<br />68.00
<br />$49,640.00
<br />18.
<br />Concrete Curb and Gutter, Type A
<br />45
<br />LFT
<br />97.00
<br />$4,365.00
<br />19.
<br />PCCP for Approaches, 6"
<br />190
<br />SYD
<br />112.00
<br />$21,280.00
<br />20.
<br />Concrete Sidewalk, 4"
<br />380
<br />SYD
<br />99.00
<br />$37,620.00
<br />21.
<br />Concrete Curb Ramp
<br />60
<br />SYD
<br />220.00
<br />$13,200.00
<br />22.
<br />Sodding
<br />1,075
<br />SYD
<br />26.80
<br />$28,810.00
<br />23.
<br />Tree, 2.5"
<br />53
<br />EA
<br />625.00
<br />$33,125.00
<br />24.
<br />Casting, Adjust to Grade
<br />5
<br />EA
<br />1,600.00
<br />$8,000.00
<br />25.
<br />Valve, Adjust to Grade
<br />4
<br />EA
<br />360.00
<br />$1,440.00
<br />26.
<br />Storm Sewer Manhole, 48"
<br />1
<br />EA
<br />4,900.00
<br />$4,900.00
<br />27.
<br />Storm Sewer Inlet, 30"
<br />3
<br />EA
<br />3,400.00
<br />$10,200.00
<br />28.
<br />Storm Sewer Pipe, 12"
<br />175
<br />LFT
<br />61.00
<br />$10,675.00
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7