BIDIPROPOSAL
<br />CITY OF SOUTH BEND
<br />Addendum No.1
<br />Project Name: South Bend Neighborhood Infrastructure Project - Longfellow Avenue
<br />Project Number:
<br />and South Street Intersection
<br />121-048B
<br />0 0%
<br />;�'TWA'
<br />7
<br />For Bids Due: November 22, 2022
<br />Contractor Name: HRP Construction Inc.
<br />Base Bid
<br />Item
<br />No,
<br />Description
<br />Quanft
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1:
<br />Construction Engineering
<br />I
<br />LS
<br />14,000.00
<br />14,000.00
<br />2.
<br />Mobilization/Demobilization
<br />I
<br />LS
<br />47,000.00
<br />47,000.00
<br />3.
<br />Maintenance of Traffic
<br />I
<br />LS
<br />15,000.00
<br />15,000.00
<br />4.
<br />Temporary Erosion Control
<br />1
<br />LS
<br />10,000.00
<br />10,000.00
<br />5.
<br />Clearing Right of Way
<br />I
<br />LS
<br />1,100.95
<br />1,100.95
<br />6.
<br />lConcrete Curb, Remove
<br />650
<br />LFT
<br />10.00
<br />6,500.00
<br />7.
<br />lConcrete Pavement, Sidewalk, Approaches, Remove
<br />350
<br />SYD
<br />25.00
<br />8,750.00
<br />8.
<br />Drainage Structure, Remove
<br />I
<br />EA
<br />1,600.00
<br />1,600.00
<br />9.
<br />Pipe, Remove
<br />20
<br />LFT
<br />50.00
<br />1,000.00
<br />10.
<br />Common Excavation
<br />880
<br />CYD
<br />45.00
<br />39,600.00
<br />11.
<br />1 8 Borrow
<br />265
<br />CYD
<br />50.00
<br />13,250.00
<br />12.
<br />Structure Backfill (Undistributed)
<br />100
<br />CYD
<br />10.00
<br />1,000.00
<br />13.
<br />Compacted Aggregate, No. 53
<br />320
<br />TON
<br />70.00
<br />22,400.00
<br />14.
<br />HMA Surface, 9,5 mm, Type B, 1.5"
<br />so
<br />TON
<br />244,13
<br />19,530.40
<br />15.
<br />HMA Intermediate, 12,5 mm, Type 8, 2,5"
<br />135
<br />TON
<br />157.12
<br />21,211.20
<br />16.
<br />HMA Base, 25,0 mm, Type B, 4"
<br />216
<br />TON
<br />120.03
<br />25,806.45
<br />17.
<br />Concrete Curb, 6"
<br />730
<br />LFT
<br />35.00
<br />25,550.00
<br />18.
<br />Concrete Curb and Gutter, Type A
<br />45
<br />LFT
<br />75.00
<br />3,375.00
<br />19.
<br />PCCP for Approaches, 6"
<br />190
<br />SYD
<br />115.00
<br />21,850.00
<br />20.
<br />Concrete Sidewalk, 4"
<br />380
<br />SYD
<br />83.00
<br />31,540.00
<br />21.
<br />Concrete Curb Ramp
<br />60
<br />SYD
<br />365.00
<br />21,900.00
<br />22. lSodding
<br />1,075
<br />SYD
<br />30.00
<br />32,250.00
<br />23. JTree,
<br />2.5"
<br />53
<br />EA
<br />625.00
<br />33,125.00"
<br />24. 1
<br />Casting, Adjust to Grade
<br />5
<br />EA
<br />300.00
<br />1,500.00
<br />25. JValve,
<br />Adjust to Grade
<br />4
<br />EA
<br />300.00
<br />1,200.00
<br />26.
<br />Storm Sewer Manhole, 48"
<br />1
<br />EA
<br />10,000.00
<br />10,000.00
<br />27.
<br />Storm Sewer Catch Basin, 30"
<br />3
<br />EA
<br />6,500.00
<br />19,500.00
<br />28.
<br />Storm Sewer Pipe, 12"
<br />175
<br />LFT
<br />80.00
<br />J
<br />14,000.001
<br />Version 09129/2021 Contractor's Bid for Public Works - 7