Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Addendum No.1 <br />Project Name: South Bend Neighborhood Infrastructure Project - Longfellow Avenue <br />Project Number: <br />and South Street Intersection <br />121-048B <br />0 0% <br />;�'TWA' <br />7 <br />For Bids Due: November 22, 2022 <br />Contractor Name: HRP Construction Inc. <br />Base Bid <br />Item <br />No, <br />Description <br />Quanft <br />Unit <br />Unit Price <br />Total Amount <br />1: <br />Construction Engineering <br />I <br />LS <br />14,000.00 <br />14,000.00 <br />2. <br />Mobilization/Demobilization <br />I <br />LS <br />47,000.00 <br />47,000.00 <br />3. <br />Maintenance of Traffic <br />I <br />LS <br />15,000.00 <br />15,000.00 <br />4. <br />Temporary Erosion Control <br />1 <br />LS <br />10,000.00 <br />10,000.00 <br />5. <br />Clearing Right of Way <br />I <br />LS <br />1,100.95 <br />1,100.95 <br />6. <br />lConcrete Curb, Remove <br />650 <br />LFT <br />10.00 <br />6,500.00 <br />7. <br />lConcrete Pavement, Sidewalk, Approaches, Remove <br />350 <br />SYD <br />25.00 <br />8,750.00 <br />8. <br />Drainage Structure, Remove <br />I <br />EA <br />1,600.00 <br />1,600.00 <br />9. <br />Pipe, Remove <br />20 <br />LFT <br />50.00 <br />1,000.00 <br />10. <br />Common Excavation <br />880 <br />CYD <br />45.00 <br />39,600.00 <br />11. <br />1 8 Borrow <br />265 <br />CYD <br />50.00 <br />13,250.00 <br />12. <br />Structure Backfill (Undistributed) <br />100 <br />CYD <br />10.00 <br />1,000.00 <br />13. <br />Compacted Aggregate, No. 53 <br />320 <br />TON <br />70.00 <br />22,400.00 <br />14. <br />HMA Surface, 9,5 mm, Type B, 1.5" <br />so <br />TON <br />244,13 <br />19,530.40 <br />15. <br />HMA Intermediate, 12,5 mm, Type 8, 2,5" <br />135 <br />TON <br />157.12 <br />21,211.20 <br />16. <br />HMA Base, 25,0 mm, Type B, 4" <br />216 <br />TON <br />120.03 <br />25,806.45 <br />17. <br />Concrete Curb, 6" <br />730 <br />LFT <br />35.00 <br />25,550.00 <br />18. <br />Concrete Curb and Gutter, Type A <br />45 <br />LFT <br />75.00 <br />3,375.00 <br />19. <br />PCCP for Approaches, 6" <br />190 <br />SYD <br />115.00 <br />21,850.00 <br />20. <br />Concrete Sidewalk, 4" <br />380 <br />SYD <br />83.00 <br />31,540.00 <br />21. <br />Concrete Curb Ramp <br />60 <br />SYD <br />365.00 <br />21,900.00 <br />22. lSodding <br />1,075 <br />SYD <br />30.00 <br />32,250.00 <br />23. JTree, <br />2.5" <br />53 <br />EA <br />625.00 <br />33,125.00" <br />24. 1 <br />Casting, Adjust to Grade <br />5 <br />EA <br />300.00 <br />1,500.00 <br />25. JValve, <br />Adjust to Grade <br />4 <br />EA <br />300.00 <br />1,200.00 <br />26. <br />Storm Sewer Manhole, 48" <br />1 <br />EA <br />10,000.00 <br />10,000.00 <br />27. <br />Storm Sewer Catch Basin, 30" <br />3 <br />EA <br />6,500.00 <br />19,500.00 <br />28. <br />Storm Sewer Pipe, 12" <br />175 <br />LFT <br />80.00 <br />J <br />14,000.001 <br />Version 09129/2021 Contractor's Bid for Public Works - 7 <br />