Laserfiche WebLink
BID/PROPOSAL Addendum No. 2 <br />CITY OF SOUTH BEND <br />Project Name: South Bend Neighborhood Infrastructure Project - Ford Street and <br />Walnut Street Intersection <br />Project Number: 121-048C <br />For Bids Due: November 22, 2022 <br />Contractor Name: Rieth-Riley Construction <br />Base Bid <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />$6,880.21 <br />$6,880.21 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />$91,000.00 <br />$91,000.00 <br />3. <br />Maintenance of Traffic <br />1 <br />LS <br />$10,029.03 <br />$10,029.03 <br />4. <br />Temporary Erosion Control <br />1 <br />LS <br />$105461.53 <br />$10,461.53 <br />5. <br />Clearing Right of Way <br />1 <br />LS <br />$9,795.31 <br />$91795.31 <br />6. <br />Curb, Concrete, Remove <br />625 <br />LFT <br />$31.52 <br />$19,700.00 <br />7. <br />Concrete Pavement, Sidewalk, Remove <br />270 <br />SYD <br />$34.85 <br />$9,409.50 <br />8. <br />Guardrail, Remove <br />115 <br />LFT <br />$18.08 <br />$2,079.20 <br />9. <br />Guardrail, W -Beam <br />100 <br />LFT <br />$45.20 <br />$4,520.00 <br />10. <br />Guardrail Terminal End Buffer (W -Beam) <br />6 <br />EA <br />$11807.94 <br />$10,847.64 <br />11. <br />Omitted <br />12. <br />Drainage Structure, Remove <br />10 <br />EA <br />$21207.67 <br />$22,076.70 <br />13. <br />Pipe, Remove <br />120 <br />LFT <br />$65.35 <br />$7,842.00 <br />14. <br />Tree, Remove <br />1 <br />EA <br />$2,008.82 <br />$2,008.82 <br />15. <br />Common Excavation <br />350 <br />CYD <br />$100.731$35,255.50 <br />fit; <br />L3 R�rr�nr <br />I qr, <br />r`vn <br />$ 1 1 7.40 <br />$1 .5_ �849- M <br />17. <br />Structure Backfill (undistributed) <br />100 <br />CYD <br />$144.06 <br />$14,406.00 <br />18. <br />Compacted Aggregate, No. 53 <br />145 <br />TON <br />$139.23 <br />$20,188.35 <br />19. <br />HMA Surface, Type B, 9.5 mm <br />130 <br />TON <br />$175.50 <br />$22,815.00 <br />20. <br />HMA for Patching, Full Depth <br />125 <br />TON <br />$251.00 <br />$31,375.00 <br />21. <br />PCCP, Speed Hump <br />90 <br />SYD <br />$153.50 <br />$13,815.00 <br />22. <br />Concrete Header <br />50 <br />LFT <br />$103.00 <br />$5,150.00 <br />23. <br />Concrete Curb, 6" <br />570 <br />LFT <br />$37.50 <br />$21,375.00 <br />24. <br />Combination Curb and Gutter, Type B <br />45 <br />LFT <br />$56.00 <br />$2,520.00 <br />25. <br />PCCP for Approaches, 6" <br />120 <br />SYD <br />$90.00 <br />$10,800.00 <br />26. <br />Concrete Sidewalk, 4" <br />305 <br />SYD <br />$63.50 <br />$19,367.50 <br />27. <br />Concrete Curb Ramp <br />65 <br />SYD <br />$294.00 <br />$19,110.00 <br />28. <br />Sodding <br />630 <br />SYD <br />$9.39 <br />$5,915.70 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />