Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: South Bond Neighborhood Infrastructure Project - Ford Street <br />and Walnut Street Intersection <br />Project Number: 121-0480 <br />For Bids Due: November 22, 2022 <br />Contractor Name. HRP Construction Inc. <br />Base Bid <br />Addendum No.2 <br />Item <br />No, <br />Description <br />Quanti <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />8,000.00 <br />8,000.00 <br />2. <br />-fMaintenance <br />1 Mobilization/Demobilization <br />I <br />LS <br />49,000.00 <br />49,000.00' <br />3. <br />of Traffic <br />I <br />LS <br />15,000.00 <br />15,000.00 <br />4. <br />Temporary Erosion Control <br />I <br />LS <br />8,000.00 <br />8,000.00' <br />5. <br />Clearing Right of Way <br />I <br />LS <br />1,195.85 <br />1,195.85 <br />6. <br />Curb, Concrete, Remove <br />625 <br />LFT <br />10.00 <br />6,250.00 <br />7. <br />lConcrete Pavement, Sidewalk, Remove <br />270 <br />SYD <br />20.00 <br />5,400.00 <br />8 <br />Guardrail, Remove <br />115 <br />LFT <br />25.00 <br />2,875.00 <br />9. <br />Guardrail, W -Beam <br />100 <br />LFT <br />34.00 <br />3,400.00 <br />10. <br />Guardrail Terminal End Buffer (W -Beam) <br />6 <br />EA <br />2,550.001 <br />15,300.00 <br />11. <br />Omitted <br />12. <br />Drainage Structure, Remove <br />10 <br />EA <br />1,600.00 <br />16,000.00 <br />13. <br />Pipe, Remove <br />120 <br />LFT <br />50.00 <br />6,000.00 <br />14. <br />Tree, Remove <br />I <br />EA <br />2,000.00 <br />2,000.00 <br />15. <br />Common Excavation <br />350 <br />CYD <br />110.00 <br />38,500.00 <br />16. <br />B Borrow <br />135 <br />CYD <br />60.00 <br />8,100.00 <br />17. <br />Structure Backfill (Undistributed) <br />100 <br />CYD <br />10.00 <br />1,000.00 <br />18. <br />Compacted Aggregate, No, 63 <br />145 <br />TON <br />60.00 <br />8,700.00 <br />19. <br />HMA Surface, Type B,. 9.5 mm <br />130 <br />TON <br />175.50 <br />22,815.00 <br />20. <br />HMA for Patching, Full Depth <br />125 <br />TON <br />251.00 <br />31,375.00 <br />21. <br />PCCP, Speed Hump <br />90 <br />SYD <br />153.50 <br />13,815.00 <br />22. <br />Concrete Header <br />50 <br />LFT <br />103.00 <br />5,150.00 <br />23. 1 <br />Concrete Curb, 6" <br />570 <br />LFT <br />45.00 <br />25,650.00 <br />24. <br />Combination Curb and Gutter, Type B <br />45 <br />LFT <br />70.00 <br />3,150.00 <br />25. <br />PCCP for Approaches, 6" <br />120 <br />SYD <br />105.00 <br />12,600.00 <br />26, <br />Concrete Sidewalk, 4" <br />305 <br />SYD <br />80.00 <br />24,400.00 <br />27. <br />Concrete Curb Romp <br />65 <br />SYD <br />330.00 <br />21,450.00 <br />L 28. ISodding <br />630 <br />SYD <br />32.001 <br />20,160.00 <br />Version 09/2912021 Contractor's Bid for Public Works - 7 <br />