BIDIPROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: South Bond Neighborhood Infrastructure Project - Ford Street
<br />and Walnut Street Intersection
<br />Project Number: 121-0480
<br />For Bids Due: November 22, 2022
<br />Contractor Name. HRP Construction Inc.
<br />Base Bid
<br />Addendum No.2
<br />Item
<br />No,
<br />Description
<br />Quanti
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />1
<br />LS
<br />8,000.00
<br />8,000.00
<br />2.
<br />-fMaintenance
<br />1 Mobilization/Demobilization
<br />I
<br />LS
<br />49,000.00
<br />49,000.00'
<br />3.
<br />of Traffic
<br />I
<br />LS
<br />15,000.00
<br />15,000.00
<br />4.
<br />Temporary Erosion Control
<br />I
<br />LS
<br />8,000.00
<br />8,000.00'
<br />5.
<br />Clearing Right of Way
<br />I
<br />LS
<br />1,195.85
<br />1,195.85
<br />6.
<br />Curb, Concrete, Remove
<br />625
<br />LFT
<br />10.00
<br />6,250.00
<br />7.
<br />lConcrete Pavement, Sidewalk, Remove
<br />270
<br />SYD
<br />20.00
<br />5,400.00
<br />8
<br />Guardrail, Remove
<br />115
<br />LFT
<br />25.00
<br />2,875.00
<br />9.
<br />Guardrail, W -Beam
<br />100
<br />LFT
<br />34.00
<br />3,400.00
<br />10.
<br />Guardrail Terminal End Buffer (W -Beam)
<br />6
<br />EA
<br />2,550.001
<br />15,300.00
<br />11.
<br />Omitted
<br />12.
<br />Drainage Structure, Remove
<br />10
<br />EA
<br />1,600.00
<br />16,000.00
<br />13.
<br />Pipe, Remove
<br />120
<br />LFT
<br />50.00
<br />6,000.00
<br />14.
<br />Tree, Remove
<br />I
<br />EA
<br />2,000.00
<br />2,000.00
<br />15.
<br />Common Excavation
<br />350
<br />CYD
<br />110.00
<br />38,500.00
<br />16.
<br />B Borrow
<br />135
<br />CYD
<br />60.00
<br />8,100.00
<br />17.
<br />Structure Backfill (Undistributed)
<br />100
<br />CYD
<br />10.00
<br />1,000.00
<br />18.
<br />Compacted Aggregate, No, 63
<br />145
<br />TON
<br />60.00
<br />8,700.00
<br />19.
<br />HMA Surface, Type B,. 9.5 mm
<br />130
<br />TON
<br />175.50
<br />22,815.00
<br />20.
<br />HMA for Patching, Full Depth
<br />125
<br />TON
<br />251.00
<br />31,375.00
<br />21.
<br />PCCP, Speed Hump
<br />90
<br />SYD
<br />153.50
<br />13,815.00
<br />22.
<br />Concrete Header
<br />50
<br />LFT
<br />103.00
<br />5,150.00
<br />23. 1
<br />Concrete Curb, 6"
<br />570
<br />LFT
<br />45.00
<br />25,650.00
<br />24.
<br />Combination Curb and Gutter, Type B
<br />45
<br />LFT
<br />70.00
<br />3,150.00
<br />25.
<br />PCCP for Approaches, 6"
<br />120
<br />SYD
<br />105.00
<br />12,600.00
<br />26,
<br />Concrete Sidewalk, 4"
<br />305
<br />SYD
<br />80.00
<br />24,400.00
<br />27.
<br />Concrete Curb Romp
<br />65
<br />SYD
<br />330.00
<br />21,450.00
<br />L 28. ISodding
<br />630
<br />SYD
<br />32.001
<br />20,160.00
<br />Version 09/2912021 Contractor's Bid for Public Works - 7