My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design of Public Infrastructure for YSB & SB Thrive Subdivision – Abonmarche Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design of Public Infrastructure for YSB & SB Thrive Subdivision – Abonmarche Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:34:19 PM
Creation date
11/8/2022 2:34:00 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br /> <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated September 20, 2022. <br /> <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $ 85,500 based on the following estimated distribution of <br />compensation: <br />a. Topographic and Utility Survey $ 9,500 <br /> <br />b. Preliminary Design $ 30,000 <br /> <br />c. Final Design & CDs $ 18,000 <br /> <br />d. Permitting $ 3,500 <br /> <br /> <br />e. SWPPP $ 3,500 <br /> <br />f. Lift Station Evaluation $ 5,000 <br />g. Utility Coordination and Staking $ 5,000 <br />h. Bidding and Negotiating Phase $ 5,000 <br />i. Construction Phase (Hourly) $ 6,000 <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner.
The URL can be used to link to this page
Your browser does not support the video tag.