My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to PSA - West Gate Repair At Century Center Proj No. 122-063 - Lawson Fisher Associates
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to PSA - West Gate Repair At Century Center Proj No. 122-063 - Lawson Fisher Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 2:33:59 PM
Creation date
11/8/2022 2:33:57 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/8/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT K, consisting of 4 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated November 8, 2016. <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. 3 <br />1.Background Data: <br />a.Effective Date of Owner-Engineer Agreement:November 8, 2016 <br />b.Owner:Board of Public Works, City of South Bend, Indiana <br />c.Engineer: Lawson-Fisher Associates P.C. <br />d.Project:South Bend Dam, West Race Repairs <br />City Project No. 115-115 <br />2.Description of Modifications: <br />a.Engineer shall perform or furnish the following Additional Services: <br />In addition to the contracted Scope of Work for the South Bend Dam, West Race <br />Repairs, LFA will provide the following additional services: <br />1.Design Calculations Update: <br />a.Update plans and structural calculations to ensure consistency based <br />on current codes and standards. Updates to factors of safety <br />calculations. <br />2.Final Design Development Bid Documents <br />a.Revise and update Bidding Documents with latest City of South <br />Bend front-end specifications, along with specification updates with <br />latest codes and standards. <br />3.Final Design Development Bid Documents <br />a.Anticipated additional regulatory agency coordination (FERC, <br />IDEM, IDNR) due to the time elapsed since initial submissions and <br />the FERC’s necessary review of the final QCIP, TCEAP, and <br />Contractor’s dewatering plan
The URL can be used to link to this page
Your browser does not support the video tag.