Laserfiche WebLink
Campeau Street <br />Project No. 121-073 <br />Bid Tab <br />October 26, 2022 <br />Campeau Street <br />City Project No. 121-073 <br />City of South Bend <br />Bid Tabulation <br />Base Bid <br />Engineer's Estimate Rieth-Riley Construction Co, Inc. HRP Construction Inc. Milestone Contractors North, Inc. <br />Item <br />No. Description Quantity Unit Unit Price Cost Unit Price Cost Unit Price Cost Unit Price Cost <br />1 Construction Engineering 1 LS $39,328.60 $39,328.60 $22,475 $22,475.00 $30,000 $30,000.00 $24,652.90 $24,652.90 <br />2 Mobilization/Demobilization 1 LS $124,840.00 $124,840.00 $98,000.00 $98,000.00 $288,000.00 $288,000.00 $219,000.00 $219,000.00 <br />3 Maintenance of Traffic 1 LS $40,000.00 $40,000.00 $23,122.00 $23,122.00 $25,000.00 $25,000.00 $56,000.00 $56,000.00 <br />4 Temporary Erosion Control 1 LS $15,000.00 $15,000.00 $13,829.38 $13,829.38 $15,000.00 $15,000.00 $4,100.00 $4,100.00 <br />5 Clearing Right of Way 1 LS $75,000.00 $75,000.00 $11,420.68 $11,420.68 $25,000.00 $25,000.00 $68,000.00 $68,000.00 <br />6 Common Excavation 3,375 CYD $35.00 $118,125.00 $71.64 $241,785.00 $45.00 $151,875.00 $81.00 $273,375.00 <br />7 Structural Backfill, Undistributed 200 CYD $40.00 $8,000.00 $80.56 $16,112.00 $35.00 $7,000.00 $79.00 $15,800.00 <br />8 Tree, 6", Remove 7 EA $600.00 $4,200.00 $1,000.00 $7,000.00 $250.00 $1,750.00 $150.00 $1,050.00 <br />9 Tree, 18", Remove 3 EA $1,500.00 $4,500.00 $1,500.00 $4,500.00 $1,033.33 $3,099.99 $800.00 $2,400.00 <br />10 Tree, 30", Remove 1 EA $2,500.00 $2,500.00 $2,500.00 $2,500.00 $8,032.11 $8,032.11 $1,200.00 $1,200.00 <br />11 Sign, Remove 3 EA $300.00 $900.00 $50.00 $150.00 $200.00 $600.00 $125.00 $375.00 <br />12 Pipe, Remove 130 LFT $35.00 $4,550.00 $44.70 $5,811.00 $100.00 $13,000.00 $30.00 $3,900.00 <br />13 Pipe, Seal and Abandon 85 LFT $35.00 $2,975.00 $42.81 $3,638.85 $150.00 $12,750.00 $30.00 $2,550.00 <br />14 Structures, Remove 13 EA $1,000.00 $13,000.00 $1,025.80 $13,335.40 $1,000.00 $13,000.00 $650.00 $8,450.00 <br />15 Concrete Curb, Remove 3,165 LFT $15.00 $47,475.00 $9.58 $30,320.70 $10.00 $31,650.00 $16.00 $50,640.00 <br />16 Concrete Approaches and Sidewalk, Remove 1,455 SYD $25.00 $36,375.00 $15.99 $23,265.45 $20.00 $29,100.00 $30.00 $43,650.00 <br />17 Concrete Pavement, Remove 95 SYD $55.00 $5,225.00 $38.48 $3,655.60 $50.00 $4,750.00 $50.00 $4,750.00 <br />18 Asphalt Milling 3,615 SYD $6.00 $21,690.00 $6.92 $25,015.80 $6.92 $25,015.80 $7.50 $27,112.50 <br />19 Compacted Aggregate, No. 53 3,815 TON $40.00 $152,600.00 $41.08 $156,720.20 $20.00 $76,300.00 $1.00 $3,815.00 <br />20 Compacted Aggregate, No. 53, Undistributed 135 TON $40.00 $5,400.00 $51.68 $6,976.80 $20.00 $2,700.00 $1.00 $135.00 <br />21 Compacted Aggregate, No. 53 for Approaches, 8"5 TON $50.00 $250.00 $362.98 $1,814.90 $75.00 $375.00 $133.00 $665.00 <br />22 HMA for Patching 260 TON $200.00 $52,000.00 $225.00 $58,500.00 $225.00 $58,500.00 $170.00 $44,200.00 <br />23 HMA for Patching, Undistributed 135 TON $200.00 $27,000.00 $150.00 $20,250.00 $150.00 $20,250.00 $170.00 $22,950.00 <br />24 HMA Surface, Type B, 9.5 mm 510 TON $150.00 $76,500.00 $140.00 $71,400.00 $140.00 $71,400.00 $160.00 $81,600.00 <br />25 HMA Intermediate, Type B, 19.0 mm 220 TON $140.00 $30,800.00 $122.00 $26,840.00 $122.00 $26,840.00 $160.00 $35,200.00 <br />26 HMA Base, Type B, 25.0 mm 525 TON $115.00 $60,375.00 $120.00 $63,000.00 $120.00 $63,000.00 $140.00 $73,500.00 <br />27 PCCP, 8"935 SYD $170.00 $158,950.00 $84.00 $78,540.00 $84.00 $78,540.00 $138.00 $129,030.00 <br />28 PCCP, Colored, 8"205 SYD $260.00 $53,300.00 $158.00 $32,390.00 $158.00 $32,390.00 $280.00 $57,400.00 <br />29 PCCP for Approaches, 6"45 SYD $140.00 $6,300.00 $130.00 $5,850.00 $130.00 $5,850.00 $142.00 $6,390.00 <br />30 PCCP for Approaches, 8"165 SYD $160.00 $26,400.00 $140.00 $23,100.00 $140.00 $23,100.00 $163.00 $26,895.00 <br />31 Concrete Curb 2,015 LFT $60.00 $120,900.00 $27.00 $54,405.00 $35.00 $70,525.00 $59.00 $118,885.00 <br />1 of 3