Laserfiche WebLink
BID TABULATION <br />2022 Contractor Paving Round 3 <br />Project No: 122-048 <br />For Bids Due: October 25, 2022 <br />Base Bid <br />Item No.Description Quantity Unit Unit Price Item Total Unit Price Item Total Unit Price Item Total <br />1 Maintenance of Traffic 1 LS 249,831.17$ 249,831.17$ 48,301.73$ 48,301.73$ 80,360.40$ 80,360.40$ <br />2 Mobilization and Demobilization 1 LS 249,831.17$ 249,831.17$ 80,947.98$ 80,947.98$ 156,500.00$ 156,500.00$ <br />3 Milling, 1.5"4,022 SY 4.52$ 18,159.33$ 2.78$ 11,181.16$ 6.00$ 24,132.00$ <br />4 Milling, 2"13,404 SY 4.20$ 56,296.80$ 3.52$ 47,182.08$ 4.00$ 53,616.00$ <br />5 Milling, 3"45,636 SY 4.20$ 191,671.20$ 3.82$ 174,329.52$ 3.80$ 173,416.80$ <br />6 HMA Surface, 9.5 mm – Type B 5,571 TONS 131.31$ 731,528.01$ 110.00$ 612,810.00$ 117.00$ 651,807.00$ <br />7 HMA Intermediate, 12.5mm - Type B 3765 TONS 117.00$ 440,505.00$ 85.00$ 320,025.00$ 102.00$ 384,030.00$ <br />8 Tack Coat 20 TONS 630.00$ 12,600.00$ 1.00$ 20.00$ 710.00$ 14,200.00$ <br />9 Joint Adhesive, Surface 13,568 LF 0.84$ 11,397.12$ 1.00$ 13,568.00$ 4.00$ 54,272.00$ <br />10 Adjust Manhole to Grade 10 EA 630.00$ 6,300.00$ 541.96$ 5,419.60$ 2,500.00$ 25,000.00$ <br />11 Adjust Inlet to Grade 9 EA 630.00$ 5,670.00$ 566.23$ 5,096.07$ 2,600.00$ 23,400.00$ <br />12 Adjust Water Valve Structure to Grade 2 EA 525.00$ 1,050.00$ 566.23$ 1,132.46$ 104.00$ 208.00$ <br />13 Pavement Message Markings, Thermoplastic, White, Lane Indication Arrow 48 EA 420.00$ 20,160.00$ 155.00$ 7,440.00$ 110.00$ 5,280.00$ <br />14 Line, Thermoplastic, Solid, White, 4"9155 LF 0.71$ 6,536.67$ 0.61$ 5,584.55$ 3.00$ 27,465.00$ <br />15 Line, Thermoplastic, Solid, White, 6"105 LF 0.90$ 94.82$ 0.96$ 100.80$ 3.00$ 315.00$ <br />16 Line, Thermoplastic, Solid, Yellow, 4"22886 LF 0.71$ 16,340.60$ 0.61$ 13,960.46$ 0.65$ 14,875.90$ <br />17 Line, Thermoplastic, Broken, White, 4"7824 LF 0.74$ 5,750.64$ 0.73$ 5,711.52$ 0.10$ 782.40$ <br />18 Line, Thermoplastic, Broken, Yellow, 4"6952 LF 0.74$ 5,109.72$ 0.73$ 5,074.96$ 0.65$ 4,518.80$ <br />19 Grooving for Pavement Markings, 4"46817 LF 1.46$ 68,329.41$ 0.48$ 22,472.16$ 0.60$ 28,090.20$ <br />20 Transverse Marking, Thermoplastic, Solid, White, 24"258 LF 0.71$ 184.21$ 12.45$ 3,212.10$ 10.00$ 2,580.00$ <br />21 Concrete Curb Ramp, Removal 1902 SY 58.80$ 111,837.60$ 48.00$ 91,296.00$ 60.00$ 114,120.00$ <br />22 Concrete Curb Ramp, Installation 1857 SY 210.00$ 389,970.00$ 161.41$ 299,738.37$ 182.00$ 337,974.00$ <br />23 Concrete Curb, Replacement 7,085 LF 31.50$ 223,177.50$ 33.65$ 238,410.25$ 70.30$ 498,075.50$ <br />24 Concrete Curb, Replacement (Undistributed)1,000 LF 22.00$ 22,000.00$ 33.65$ 33,650.00$ 70.30$ 70,300.00$ <br />25 Concrete Header, Replacement 522 LF 210.00$ 109,620.00$ 174.74$ 91,214.28$ 148.00$ 77,256.00$ <br />26 Traffic Loop Lane Replacement 2 EA 500.00$ 1,000.00$ 2,100.00$ 4,200.00$ 2,100.00$ 4,200.00$ <br />27 Pedestrian Push Button 32 EA 300.00$ 9,600.00$ 1,850.00$ 59,200.00$ 1,850.00$ 59,200.00$ <br />28 HMA for Patching 255 TONS 160.00$ 40,800.00$ 259.69$ 66,220.95$ 255.00$ 65,025.00$ <br />3,005,350.96$ 2,267,500.00$ 2,951,000.00$ <br />M/WBE Inclusion <br />Addendum #1 <br />Addendum #2 <br />Addendum #3 <br />Addendum #4 <br />I hereby certify that the above truly and accurately represents bids received for this project on October 25, 2022 <br />Scott Kreeger, Project Engineer <br />Non-Collusion Affadavit Y Y <br />BASE BID TOTAL <br />Engineer's Estimate Rieth Riley Construction Co., Inc.Milestone Contractors North, Inc. <br />Bid Bond Y Y <br />Y Y <br />Y Y <br />Y Y <br />Y Y <br />Y Y <br />Page 1 of 1