| 
								    BID/PROPOSAL 
<br />CITY OF SOUTH BEND 
<br />Project Name: Main Street Improvements Between Sherwood Street and Dean Street 
<br />Project Number: 122-045 
<br />For Bids Due: November 8, 2022 
<br />Contractor Name: -Rieth-Riley Construction CoJnc. 
<br />BASE BID – MAIN STREET (FROM SHERWOOD STREET TO DEAN STREET) 
<br />Item 
<br />No. 
<br />Description 
<br />Quantity 
<br />Unit 
<br />Unit Price 
<br />Total Amount 
<br />1 
<br />Common Excavation 
<br />446 
<br />CYS 
<br />$ 82.87 
<br />$36,960.02 
<br />2 
<br />Concrete, Remove 
<br />198 
<br />SYS 
<br />$ 38.10 
<br />$ 7,543.80 
<br />3 
<br />Subgrade Treatment Type 11 
<br />865 
<br />SYS 
<br />$ 21.03 
<br />$18,190.95 
<br />4 
<br />Compacted No. 53 Subbase 
<br />270 
<br />TON 
<br />$ 61.92 
<br />$16,718.40 
<br />5 
<br />Milling, 1.5 in. 
<br />3208 
<br />SYS 
<br />$ 4.04 
<br />$12,960.32 
<br />6 
<br />HMA Surface, PG64-28P, Type B 
<br />321 
<br />TON 
<br />$ 145.55 
<br />$46,721.55 
<br />7 
<br />HMA Intermediate, Type B 
<br />94 
<br />TON 
<br />$ 309.17 
<br />$29,061.98 
<br />8 
<br />HMA Base, Type B 
<br />220 
<br />TON 
<br />$ 190.28 
<br />$41,861.60 
<br />9 
<br />Tack Coat 
<br />2 
<br />TON 
<br />$ 339.14 
<br />$ 678.28 
<br />10 
<br />Joint Adhesive, Surface 
<br />1216 
<br />LFT 
<br />$ 2.82 
<br />$ 3,429.12 
<br />11 
<br />PCCP for Approaches, 6 in. 
<br />23 
<br />$ 158.83 
<br />$ 3,653.09 
<br />12 
<br />Sidewalk, Concrete 
<br />28 
<br />—SYS 
<br />SYS 
<br />$ 121.41 
<br />$ 3,399.48 
<br />13 
<br />Curb, Concrete 
<br />766 
<br />LFT 
<br />$ 98.72 
<br />$75,619.52 
<br />14 
<br />Drywell, 3600 gal. Capacity 
<br />2 
<br />EA 
<br />$11,197.49 
<br />$22,394.98 
<br />15 
<br />Curb Ramp, Concrete 
<br />29 
<br />SYS 
<br />$ 359.79 
<br />$10,433.91 
<br />16 
<br />Sodding, Nursery 
<br />434 
<br />SYS 
<br />$ 19.53 
<br />$ 8,476.02 
<br />17 
<br />Tree, Remove, 30 in. 
<br />2 
<br />EA 
<br />$ 7,756.73 
<br />$15,513.46 
<br />18 
<br />Tree Planting 
<br />9 
<br />EA 
<br />$ 1,018.72 
<br />$ 9,168.48 
<br />19 
<br />Adjust Casting to Grade 
<br />5 
<br />EA 
<br />$ 723.21 
<br />$ 3,616.05 
<br />20 
<br />Adjust Water Valve Casting to Grade 
<br />2 
<br />EA 
<br />$ 301.34 
<br />$ 602.68 
<br />21 
<br />Curb Box, Adjust to Grade 
<br />9 
<br />EA 
<br />$ 1,638.42 
<br />$14,745.78 
<br />22 
<br />Fire Hydrant Assembly, Relocate 
<br />1 
<br />EA 
<br />$ 7,186.34 
<br />$ 7,186.34 
<br />23 
<br />Sheet Sign with Legend 0.080 in. 
<br />25 
<br />SFT 
<br />$ 24.30 
<br />$ 607.50 
<br />24 
<br />Sheet Sign, Remove 
<br />3 
<br />EA 
<br />$ 386.91 
<br />$ 1,160.73 
<br />25 
<br />Line, Thermoplastic, Solid, Yellow, 4 in. 
<br />1 CD40 
<br />LFT 
<br />$ 0.91 
<br />$ 1,492.40 
<br />26 
<br />Line, Thermoplastic, Solid, White, 4 in. 
<br />2208 
<br />LFT 
<br />$ 0.91 
<br />$ 2,009.28 
<br />27 
<br />Line, Thermoplastic, Broken, Yellow, 4 in. 
<br />410 
<br />LFT 
<br />$ 0.96 
<br />$ 393.60 
<br />28 
<br />Line, Thermoplastic, Dotted, Yellow, 4 IN., 
<br />2 FT. Line, 4 FT - Gap 
<br />30 
<br />LFT 
<br />$ 1.72 
<br />$ 51.60 
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7 
<br />
								 |