BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Main Street Improvements Between Sherwood Street and Dean Street
<br />Project Number: 122-045
<br />For Bids Due: November 8, 2022
<br />Contractor Name: -Rieth-Riley Construction CoJnc.
<br />BASE BID – MAIN STREET (FROM SHERWOOD STREET TO DEAN STREET)
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Common Excavation
<br />446
<br />CYS
<br />$ 82.87
<br />$36,960.02
<br />2
<br />Concrete, Remove
<br />198
<br />SYS
<br />$ 38.10
<br />$ 7,543.80
<br />3
<br />Subgrade Treatment Type 11
<br />865
<br />SYS
<br />$ 21.03
<br />$18,190.95
<br />4
<br />Compacted No. 53 Subbase
<br />270
<br />TON
<br />$ 61.92
<br />$16,718.40
<br />5
<br />Milling, 1.5 in.
<br />3208
<br />SYS
<br />$ 4.04
<br />$12,960.32
<br />6
<br />HMA Surface, PG64-28P, Type B
<br />321
<br />TON
<br />$ 145.55
<br />$46,721.55
<br />7
<br />HMA Intermediate, Type B
<br />94
<br />TON
<br />$ 309.17
<br />$29,061.98
<br />8
<br />HMA Base, Type B
<br />220
<br />TON
<br />$ 190.28
<br />$41,861.60
<br />9
<br />Tack Coat
<br />2
<br />TON
<br />$ 339.14
<br />$ 678.28
<br />10
<br />Joint Adhesive, Surface
<br />1216
<br />LFT
<br />$ 2.82
<br />$ 3,429.12
<br />11
<br />PCCP for Approaches, 6 in.
<br />23
<br />$ 158.83
<br />$ 3,653.09
<br />12
<br />Sidewalk, Concrete
<br />28
<br />—SYS
<br />SYS
<br />$ 121.41
<br />$ 3,399.48
<br />13
<br />Curb, Concrete
<br />766
<br />LFT
<br />$ 98.72
<br />$75,619.52
<br />14
<br />Drywell, 3600 gal. Capacity
<br />2
<br />EA
<br />$11,197.49
<br />$22,394.98
<br />15
<br />Curb Ramp, Concrete
<br />29
<br />SYS
<br />$ 359.79
<br />$10,433.91
<br />16
<br />Sodding, Nursery
<br />434
<br />SYS
<br />$ 19.53
<br />$ 8,476.02
<br />17
<br />Tree, Remove, 30 in.
<br />2
<br />EA
<br />$ 7,756.73
<br />$15,513.46
<br />18
<br />Tree Planting
<br />9
<br />EA
<br />$ 1,018.72
<br />$ 9,168.48
<br />19
<br />Adjust Casting to Grade
<br />5
<br />EA
<br />$ 723.21
<br />$ 3,616.05
<br />20
<br />Adjust Water Valve Casting to Grade
<br />2
<br />EA
<br />$ 301.34
<br />$ 602.68
<br />21
<br />Curb Box, Adjust to Grade
<br />9
<br />EA
<br />$ 1,638.42
<br />$14,745.78
<br />22
<br />Fire Hydrant Assembly, Relocate
<br />1
<br />EA
<br />$ 7,186.34
<br />$ 7,186.34
<br />23
<br />Sheet Sign with Legend 0.080 in.
<br />25
<br />SFT
<br />$ 24.30
<br />$ 607.50
<br />24
<br />Sheet Sign, Remove
<br />3
<br />EA
<br />$ 386.91
<br />$ 1,160.73
<br />25
<br />Line, Thermoplastic, Solid, Yellow, 4 in.
<br />1 CD40
<br />LFT
<br />$ 0.91
<br />$ 1,492.40
<br />26
<br />Line, Thermoplastic, Solid, White, 4 in.
<br />2208
<br />LFT
<br />$ 0.91
<br />$ 2,009.28
<br />27
<br />Line, Thermoplastic, Broken, Yellow, 4 in.
<br />410
<br />LFT
<br />$ 0.96
<br />$ 393.60
<br />28
<br />Line, Thermoplastic, Dotted, Yellow, 4 IN.,
<br />2 FT. Line, 4 FT - Gap
<br />30
<br />LFT
<br />$ 1.72
<br />$ 51.60
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7
<br />
|