Laserfiche WebLink
a.Met with Traffic Control Specialists (3.0%),Hawk (0.3%), <br />Slussers (1.48%),B.U.C Const (0.14%),V&R Trucking (0.12%, <br />Shoshone Trucking (0.36%) <br />•b.MBE:2.9% <br />a.Met with 1st Class Logistics (.72%),Kennedy Expressline (0.68%, <br />C.Lee Construction (0.78%),V&R Trucking (0.72%) <br />ii.2.The M/WBE Goals for this Project when awarded as Divisions 1B,2B,3B,4 <br />and 5 are Not awarded <br />•a.WBE 5.5%. <br />•b.MBE 3.1%. <br />c.Contract Amount:$4,970,000 <br />d.PM:Leslie Biek <br />e.NTP expected 4/1/23 <br />f.Completion date expected: 8/31/23 <br />37.2022 Contractor Paving,Round 2 –Received two (2)bids on 6.28.2022 <br />a.Project awarded to Rieth-Riley Construction Co.,Inc.On 7/26/22 <br />b.Contract Goals: <br />i.Base MBE:4.11%[met via 1st Class Logistics 4.11%] <br />ii.Base WBE:5.84%[met via Traffic Control Specialists 0.19%,CE Hughes Milling <br />2.26%,State Barricading 0.69%,Montgomery Trucking 2.71%,Total amount <br />5.85%] <br />c.Contract Amount:$2,090,801 <br />d.PM:Scott Kreeger <br />e.NTP:8/15/2022 <br />f.Project Duration (Days):94 <br />37.Curb and Sidewalk 2022 Round 1 <br />a.Received 4 bids on 7/12/2022 <br />iii. <br />i.Rieth-Riley had insufficient MBE meeting and did not fulfill GFE requirements, <br />determined non-responsive <br />ii.Premium had insufficient WBE meeting but did fulfill GFE requirements,and <br />thus was responsive <br />Milestone and Selge were responsive <br />b.Contract Goals: <br />i.Div 1:3%M,5%W <br />•Milestone Contractors <br />•3.01%M with Kennedy Expressline (0.86%)and 1st Class Logistics <br />(2.15%) <br />•6.28%W with Slusser's Green Thumb <br />ii.Div 2:3%M,5%W