Laserfiche WebLink
October 2022 <br />Detailed Report <br />BPW Updates to IPC Board: <br />Bid/Quotes with MWBE Goals for the period beginning Jan 1,2021 to October 11,2022 <br />1.Lincolnway West and Olive Streetscape <br />a.Awarded 5/11/2021 to Rieth-Riley <br />b.Contract Goals: <br />i.MBE 2.43% <br />•Bid with V&R Trucking (2.58%) <br />ii.WBE 4.94% <br />•Bid with Hawk Inc.(31.73%) <br />c.Contract Amount: <br />i.Awarded:$1,740,871.20 <br />ii.Current:$1,802,048.78 <br />d.PM:Finn Cavanaugh,Inspector:Dan Jones <br />e.Contract Completion Date:10/22/2021 <br />f.Status:Complete,closeout documents in process <br />g.PCA estimated for October 2022 <br />2.2021 Road Rehab <br />a.Awarded on 6/22/2021 to Rieth Riley <br />b.Contract Goals: <br />i.MBE:3.2% <br />•Met with V&R Trucking (3.2%) <br />ii.WBE:5.6% <br />•Met with V&R Trucking (3.3%),State Barricading,(0.8%),CE Hughes <br />(1.5%) <br />c.Contract Amount:$1,997,416.06 Awarded (Final:$2,106,346.88) <br />d.PM:Leslie Biek <br />e.Project Duration:5/1/2022 <br />f.PCA TBD <br />3.Mayflower and Sample Intersection Improvements (120-052R) <br />a.Awarded on 7/13/2021 to Milestone Contractors N <br />b.Contract Goals: <br />i.MBE 2.3% <br />•Met with V&R Trucking (1.15%)and C. Lee Construction (1.15%) <br />ii.WBE 4.9% <br />•Met with Traffic Control Specialists (7.32%) <br />c.Contract Amount:347,636.15 Awarded (338,467.54 Final)