Laserfiche WebLink
19. 2021 Community Crossings Paving Round 2 – Received two (2) bids on 1.25.2022 <br />a. Awarded to Reith Riley on 2.22.2022 after securing additional funding as both bids were <br />over the available budget. <br />b. Contract Goals: <br />i. MBE: 4.19% [met via 1st Class Logistics] <br />ii. WBE: 6.04% [met via Montgomery Trucking 2.01%, Traffic Control Specialists <br />2.65%, State Barricading 1.38%] <br />c. Contract Amount: $1,271,724.40 <br />d. Project Manager: Leslie Biek <br />e. NTP: 4/1/22 <br />f. Project Duration (Days): 90 days, but will be extended due to additional work (speed <br />humps) <br />g. PCA TBD <br /> <br />20. Studebaker Fountain Water Improvement Project – Received one (1) quote on 1.25.2022 <br />a. Quote rejected as non-responsive and proceeded to the open market - awarded as <br />Open Market Contract on 3.8.2022 to Selge Construction (only one open market <br />contract response) <br />b. Contract Goals: <br />i. MBE: 1.3% [met via JBL Signal and Lighting 3.8%] <br />ii. WBE: 4.3% [met via BUC Construction Supply 11.4%, State Barricading Inc. 2.3%] <br />c. Contract Amount: <br />i. Awarded: $158,440.50 <br />ii. Final:$150,913 <br />d. PM: Sarah Beam <br />e. NTP: 3/8/2022 <br />f. Project Duration (Days): 114 <br />g. Project Completed: June 30, 2022 <br />h. PCA was approved through BPW on August 9, 2022 <br /> <br />21. Walker Field House Restoration Project – No quotes on 2.22.2022 <br />a. Path forward: <br />i. Rescope and requote on 5.10.2022 – No quotes on 5.10.2022 <br />ii. Requote in November 2022 <br />b. Contract Goals from 02.22.2022 open: <br />i. Base Bid MBE: 0.3% <br />ii. Base Bid WBE: 1.6% <br />iii. Alternate 1 MBE: 0.8% <br />iv. Alternate 1 WBE: 3.1% <br />c. Contract Goals for requote on 5.10.2022: <br />i. Base Bid MBE: 0.6% <br />ii. Base Bid WBE: 3.6% <br />iii. Alternate 1 MBE: 0% - steel fabrication (NAICS 238190)