Laserfiche WebLink
c. Contract Amount: $1,671,500.00 <br />d. Contract Completion Date: 12/31/2022. <br />e. PM: Jacob Klosinski <br />f. NTP: 12/15/2021 <br />g. Project Duration: 12/31/2022 <br /> <br />13. Riverside Drive Bank Stabilization <br />a. Awarded on January 11, 2022 <br />b. Contract Goals: <br />i. Base Bid <br />• MBE 0.3 % (util. C Lee, trucking, 0.32%) <br />• WBE 0.8 % (util. State Barricading, MOT, 0.8%, Slusser, landscaping, <br />0.36%, Total 1.16%) <br />c. Contract Amount: $816,305.00 <br />d. PM: Becca Plantz <br />e. NTP: February 14, 2022 <br />f. Project Duration: October 14, 2022 <br />g. PCA TBD <br /> <br />14. 2021 Demolitions <br />a. Awarded on 1/11/22 to Green Demolition <br />b. Contract Goals: <br />i. MBE: 1.4% <br />• Kennedy Expressline ($11,316.60 or 3%) <br />ii. WBE: 4.7% <br />• SAN Corporation ($18,861 or 5%) <br />c. Contract Amount: $377,220 <br />d. PM: Zach Hurst <br />e. NTP: 3/15/22 <br />f. Project Duration: 60 days <br />g. Work is completed, need to verify in B2GNow that subs have been paid. <br />h. PCA TBD <br /> <br />15. Airport Annexation Area Water Main Extension <br />a. Awarded on 12/XX/2021. Awarded to G.E. Marshall. <br />b. Contract Goals <br />i. MBE: 6.4% <br />ii. WBE: 10.5% <br />c. Contract Amount: <br />i. Awarded: $313,196.40 <br />d. PM: Jacob Klosinski <br />e. NTP: 12/21/2021