Laserfiche WebLink
a. Met with Traffic Control Specialists (3.0%), Hawk (0.3%), <br />Slussers (1.48%), B.U.C Const (0.14%), V&R Trucking (0.12%, <br />Shoshone Trucking (0.36%) <br />• b. MBE: 2.9% <br />a. Met with 1st Class Logistics (.72%), Kennedy Expressline (0.68%, <br />C. Lee Construction (0.78%), V&R Trucking (0.72%) <br />ii. 2. The M/WBE Goals for this Project when awarded as Divisions 1B, 2B, 3B, 4 <br />and 5 are Not awarded <br />• a. WBE 5.5%. <br />• b. MBE 3.1%. <br />c. Contract Amount: $4,970,000 <br />d. PM: Leslie Biek <br />e. NTP expected 4/1/23 <br />f. Completion date expected: 8/31/23 <br /> <br />37. 2022 Contractor Paving, Round 2 – Received two (2) bids on 6.28.2022 <br />a. Project awarded to Rieth-Riley Construction Co., Inc. On 7/26/22 <br />b. Contract Goals: <br />i. Base MBE: 4.11% [met via 1st Class Logistics 4.11%] <br />ii. Base WBE: 5.84% [met via Traffic Control Specialists 0.19%, CE Hughes Milling <br />2.26%, State Barricading 0.69%, Montgomery Trucking 2.71%, Total amount <br />5.85%] <br />c. Contract Amount: $2,090,801 <br />d. PM: Scott Kreeger <br />e. NTP: 8/15/2022 <br />f. Project Duration (Days): 94 <br /> <br />38. Curb and Sidewalk 2022 Round 1 <br />a. Received 4 bids on 7/12/2022 <br />i. Rieth-Riley had insufficient MBE meeting and did not fulfill GFE requirements, <br />determined non-responsive <br />ii. Premium had insufficient WBE meeting but did fulfill GFE requirements, and <br />thus was responsive <br />iii. Milestone and Selge were responsive <br />b. Contract Goals: <br />i. Div 1: 3% M, 5% W <br />• Milestone Contractors <br />• 3.01% M with Kennedy Expressline (0.86%) and 1st Class Logistics <br />(2.15%) <br />• 6.28% W with Slusser's Green Thumb <br />ii. Div 2: 3% M, 5% W