Laserfiche WebLink
October 2022 <br />Detailed Report <br />BPW Updates to IPC Board: <br /> Bid/Quotes with MWBE Goals for the period beginning Jan 1, 2021 to October 11, 2022 <br />1. Lincolnway West and Olive Streetscape <br />a. Awarded 5/11/2021 to Rieth-Riley <br />b. Contract Goals: <br />i. MBE 2.43% <br />• Bid with V&R Trucking (2.58%) <br />ii. WBE 4.94% <br />• Bid with Hawk Inc. (31.73%) <br />c. Contract Amount: <br />i. Awarded: $1,740,871.20 <br />ii. Current: $1,802,048.78 <br />d. PM: Finn Cavanaugh, Inspector: Dan Jones <br />e. Contract Completion Date: 10/22/2021 <br />f. Status: Complete, closeout documents in process <br />g. PCA estimated for October 2022 <br /> <br />2. 2021 Road Rehab <br />a. Awarded on 6/22/2021 to Rieth Riley <br />b. Contract Goals: <br />i. MBE: 3.2% <br />• Met with V&R Trucking (3.2%) <br />ii. WBE: 5.6% <br />• Met with V&R Trucking (3.3%), State Barricading, (0.8%), CE Hughes <br />(1.5%) <br />c. Contract Amount: $1,997,416.06 Awarded (Final: $2,106,346.88) <br />d. PM: Leslie Biek <br />e. Project Duration: 5/1/2022 <br />f. PCA TBD <br /> <br />3. Mayflower and Sample Intersection Improvements (120-052R) <br />a. Awarded on 7/13/2021 to Milestone Contractors N <br />b. Contract Goals: <br />i. MBE 2.3% <br />• Met with V&R Trucking (1.15%) and C. Lee Construction (1.15%) <br />ii. WBE 4.9% <br />• Met with Traffic Control Specialists (7.32%) <br />c. Contract Amount: 347,636.15 Awarded (338,467.54 Final)