Laserfiche WebLink
Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated_______, 2022. <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br />A.Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1.A Lump Sum amount of $ 115,000.00 based on the following estimated distribution <br />of compensation: <br />a.Project Adinistration / Meetings $ 8,000.00 <br />b.Aditional Topographic Survey $ 1,850.00 <br />c.Lighting Design $ 9,550.00 <br />d.Utility Coordination $ 10,500.00 <br />e.Sanitary Sewer Design $ 7,900.00 <br />f.Conceptual Design (renderings)$ 3,600.00 <br />g.Roadway Design $35,000.00 <br />h.Bidding Phase $5,500.00 <br />i.Streetscape and Landscape Architecture $33,100.00 <br />2.Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />3.The Lump Sum includes compensation for Engineer’s services and services of Engineer’s <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4.The portion of the Lump Sum amount billed for Engineer’s services will be based upon <br />Engineer’s estimate of the percentage of the total services actually completed during the <br />billing period.