My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Linden Ave. Streetscape Proj No. 122-050 - VS Engineering, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Linden Ave. Streetscape Proj No. 122-050 - VS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:49:54 PM
Creation date
10/25/2022 1:49:33 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/25/2022
Highlight
ID:
1
Creator:
Created:
10/25/2022 1:49 PM
Modified:
10/25/2022 1:49 PM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 8 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />1.Prepare final Drawings and Specifications indicating the scope, extent, and character of the <br />Work to be performed and furnished by Contractor. <br />2.Provide technical criteria, written descriptions, and design data for Owner’s use in filing <br />applications for permits from or approvals of governmental authorities having jurisdiction <br />to review or approve the final design of the Project; assist Owner in consultations with such <br />authorities; and revise the Drawings and Specifications in response to directives from such <br />authorities. <br />3.Task 90% Plan documents are based on the approved 60% documents. This milestone <br />shall match that of the Civil Engineer’s. Consultant shall: <br />1)Prepare 90% landscape planting plan drawings. <br />2)Prepare 90% technical specifications in Microsoft Word format (for all milestone <br />deliverables). <br />3)Prepare updated opinion of probable cost. <br />4)Prepare an colorized exhibit suitable for a public meeting. <br />4.Advise Owner of any adjustments to the opinion of probable Construction Cost known to <br />Engineer. <br />a.Assumptions: <br />1)All project related construction activities will be completed within existing right- <br />of-way. There will be no right-of-way engineering or land acquisition required <br />for the project. <br />2)The only environmental permit required for the project will be the IDEM <br />Construction Stormwater General Permit. <br />5.Prepare and furnish bidding documents for review by Owner, its legal counsel, and other <br />advisors, and assist Owner in the preparation of other related documents. Within 7 days <br />of receipt, Owner shall submit to Engineer any comments and, subject to the provisions of <br />Paragraph 6.01.G, instructions for revisions. <br />6.Revise the bidding documents in accordance with comments and instructions from the <br />Owner, as appropriate, and submit 2 final copies of the bidding documents, a revised <br />opinion of probable Construction Cost, and any other deliverables to Owner within 14 <br />calendar days after receipt of Owner’s comments and instructions. <br />B.Engineer’s services under the Final Design Phase will be considered complete on the date when the <br />submittals required by Paragraph A1.03.A.6 have been delivered to Owner. <br />C.In the event that the Work designed or specified by Engineer is to be performed or furnished under <br />more than one prime contract, or if Engineer’s services are to be separately sequenced with the <br />work of one or more prime Contractors (such as in the case of fast-tracking), Owner and Engineer <br />shall, prior to commencement of the Final Design Phase, develop a schedule for performance of <br />Engineer’s services during the Final Design, Bidding or Negotiating, Construction, and Post- <br />Construction Phases in order to sequence and coordinate properly such services as are applicable to
The URL can be used to link to this page
Your browser does not support the video tag.