My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Automatic Entrance Gates & Parking Lot Improvements Century Center – Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Automatic Entrance Gates & Parking Lot Improvements Century Center – Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:49:32 PM
Creation date
10/25/2022 1:49:26 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Studebaker Fountain Water Service Modifications <br />February 19, 2021 <br />Page 1 of 3 <br />October 13, 2022 <br />City of South Bend <br />Division of Engineering <br />1316 County-City Building <br />227 West Jefferson Boulevard <br />South Bend, Indiana 46601 <br />Attention: Ms. Becca Platz, Project Engineer <br />RE: PROFESSIONAL DESIGN SERVCIES FOR THE NEW ENTRANCE GATES AT <br />CENTURY CENTER PARKING IN SOUTH BEND, INDIANA. <br />Dear Becca: <br />Thank you for contacting Jones Petrie Rafinski (JPR) regarding the above referenced project. We have <br />appreciated being able to be of service to you in the past and hope to be afforded the opportunity to <br />provide you with our services for this project. <br />UNDERSTANDING OF THE ASSIGNMENT <br />The City of South Bend Venues Parks and Arts has decided to install the automated gates at the west <br />entrance to the Century Center Parking Lot in downtown South Bend. JPR originally designed the current <br />entrance back in 2018 with the intention of these gates being installed in the future. <br />Based on previous discussions, it is thought that the necessary conduit and pull wires were installed at <br />the time of the 2018 reconfiguration and that this phase of design and plans should require gate locations, <br />foundations and electrical connections. <br />It is also understood that the VPA would like to look at solutions to the existing and deteriorating asphalt <br />parking lot surface and maintenance drives around the Century Center Building. This may include crack <br />filling, patching and resealing, a milling and resurfacing or other possible solution. <br />JPR currently possesses the existing survey and as-built information for the entrance gate, but the City of <br />South Bend may have additional existing topographic survey for the parking lot area and additional areas <br />around the building that may require repaving. <br />The City anticipates that the first task of the entrance gates will be sent out as a quote package due, and <br />the second task of sealing or repaving may be sent out as either a quote or bid.
The URL can be used to link to this page
Your browser does not support the video tag.