Laserfiche WebLink
<br /> <br />Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />This is EXHIBIT C, consisting of 2 pages, referred to in and <br />part of the Agreement between Owner and Engineer for <br />Professional Services dated , . <br /> <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum Method <br />of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of Engineer’s <br />Resident Project Representative, if any, as follows: <br />1. Design Services amount not to exceed $ 159,900.00, based on the following estimated <br />distribution of compensation: <br />Item Description Amount Type <br />a. Traffic Signal Warrant Analysis $4,800.00 Lump Sum <br />b. HAWK Signal Warrant Analysis, if required $3,200.00 Lump Sum <br />c. Topographic Survey $16,500.00 Lump Sum <br />d. Planting Plans $8,000.00 Lump Sum <br />e. Traffic Signal Design, or $15,900.00 $15,900.00 Lump Sum HAWK Signal Design, if required $12,500.00 <br />f. Traffic Signal Modifications (3 @ $12,500/each, 1 @ <br />$8,000/each) $45,500.00 Lump Sum <br />g. Conceptual Plans $3,500.00 Lump Sum <br />h. Design Plans $50,000.00 Lump Sum <br />i. Construction Stormwater General Permit $4,500.00 Lump Sum <br />j. Bidding and Construction Phase $8,000.00 Hourly <br /> Total, Not To Exceed $159,900.00 <br /> <br />2. Engineer may alter the distribution of compensation between individual phases noted herein <br />to be consistent with services actually rendered, but shall not exceed the total Lump Sum Not <br />To Exceed amount unless approved in writing by the Owner. <br />3. The Lump Sum amount includes compensation for Engineer’s services and services of <br />Engineer’s Consultants, if any. Appropriate amounts have been incorporated in the Lump <br />Sum amount to account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer’s services will be based upon <br />Engineer’s estimate of the percentage of the total services actually completed during the <br />billing period.