Laserfiche WebLink
<br />Page 12 <br />(Exhibit A –Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />28. Lighting Design. <br />29. Pavement Design or geotechnical services. <br />A2.02 Additional Services Not Requiring Owner’s Written Authorization <br />A. Engineer shall advise Owner in advance that Engineer is will immediately commence to perform or <br />furnish the Additional Services of the types listed below. For such Additional Services, Engineer <br />need not request or obtain specific advance written authorization from Owner. Engineer shall cease <br />performing or furnishing such Additional Services upon receipt of written notice from Owner. <br />1. Services in connection with work change directives and change orders to reflect changes <br />requested by Owner. <br />2. Services in making revisions to Drawings and Specifications occasioned by the acceptance <br />of substitute materials or equipment other than “or-equal” items; services after the award of <br />the Construction Contract in evaluating and determining the acceptability of a proposed "or <br />equal" or substitution which is found to be inappropriate for the Project; evaluation and <br />determination of an excessive number of proposed "or equals" or substitutions, whether <br />proposed before or after award of the Construction Contract. <br />3. Services resulting from significant delays, changes, or price increases occurring as a direct <br />or indirect result of materials, equipment, or energy shortages. <br />4. Additional or extended services during construction made necessary by (1) emergencies or <br />acts of God endangering the Work (advance notice not required), (2) the presence at the Site <br />of any Constituent of Concern or items of historical or cultural significance, (3) Work <br />damaged by fire or other cause during construction, (4) a significant amount of defective, <br />neglected, or delayed work by Contractor, (5) acceleration of the progress schedule involving <br />services beyond normal working hours, or (6) default by Contractor. <br />5. Services (other than Basic Services during the Post-Construction Phase) in connection with <br />any partial utilization of any part of the Work by Owner prior to Substantial Completion. <br />6. Evaluating an unreasonable claim or an excessive number of claims submitted by Contractor <br />or others in connection with the Work. <br />7. Services during the Construction Phase rendered after the original date for completion of the <br />Work referred to in A1.05.B. <br />8. Reviewing a Shop Drawing more than three times, as a result of repeated inadequate <br />submissions by Contractor. <br />9. While at the Site, compliance by Engineer and its staff with those terms of Owner's or <br />Contractor's safety program provided to Engineer subsequent to the Effective Date that <br />exceed those normally required of engineering personnel by federal, state, or local safety <br />authorities for similar construction sites. <br />