My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Design Services 2023 Small Drainage Improvements Proj No. 123-006 – A&Z Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Design Services 2023 Small Drainage Improvements Proj No. 123-006 – A&Z Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2022 4:05:41 PM
Creation date
10/11/2022 4:05:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agr eement Between Owner and Engineer for Pr ofessional Ser vices. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of pages, referred to <br />in and part of the Agreement between Owner and Engineer <br />for Professional Services dated , . <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br />T.Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1.A Lump Sum amount of $ 61,766 based on the following estimated distribution of <br />compensation: <br />Garland Circle <br />a.Study and Report Phase & Survey $ 18,058 <br />b.Preliminary Design Phase $ 12,030 <br />c.Final Design Phase $ 11,150 <br />d.Bidding and Negotiating Phase $ 2,110 <br />e.Construction Phase $ 1,000 <br />f.Post-Construction Phase $ N/A <br />Blackford Circle <br />g.Study and Report Phase & Survey $ 17,418 <br />2.Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />3.The Lump Sum includes compensation for Engineer’s services and services of Engineer’s <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses.
The URL can be used to link to this page
Your browser does not support the video tag.