Laserfiche WebLink
Page 8 <br />(Exhibit A – Engineer ’ s Ser vices) <br />EJCDC E-500 Agr eement Between Owner and Engineer for Pr ofessional Ser vices <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reser ved. <br />damaged by fire or other cause during construction, (4) a significant amount of defective, <br />neglected, or delayed work by Contractor, (5) acceleration of the progress schedule <br />involving services beyond normal working hours, or (6) default by Contractor. <br />5.Services (other than Basic Services during the Post-Construction Phase) in connection with <br />any partial utilization of any part of the Work by Owner prior to Substantial Completion. <br />6.Evaluating an unreasonable claim or an excessive number of claims submitted by <br />Contractor or others in connection with the Work. <br />7.Reviewing a Shop Drawing more than three times, as a result of repeated inadequate <br />submissions by Contractor. <br />8.While at the Site, compliance by Engineer and its staff with those terms of Owner's or <br />Contractor's safety program provided to Engineer subsequent to the Effective Date that <br />exceed those normally required of engineering personnel by federal, state, or local safety <br />authorities for similar construction sites.