Laserfiche WebLink
Page 1 <br />(Exhibit A – Engineer ’ s Ser vices) <br />EJCDC E-500 Agr eement Between Owner and Engineer for Pr ofessional Ser vices <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reser ved. <br />This is EXHIBIT A, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br />Engineer’s Services <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br />Engineer shall provide Basic and Additional Services as set forth below. <br />PART 1 – BASIC SERVICES <br />A1.01 Study and Report Phase & Survey (Garland Circle Study & Blackford Court Study) <br />A.Engineer shall: <br />1.Consult with Owner to define and clarify Owner’s requirements for the Project and <br />available data. <br />2.Advise Owner of any need for Owner to provide da ta or services of the types described in <br />Exhibit B which are not part of Engineer’s Basic Services. <br />3.Identify, consult with, and analyze requirements of governmental authorities having <br />jurisdiction to approve the portions of the Project designed or specified by Engineer, <br />including but not limited to mitigating measures identified in the environmental <br />assessment. <br />4.Identify and evaluate a minimum of two alternate solutions available to Owner and, after <br />consultation with Owner, recommend to Owner those solutions which in Engineer’s <br />judgment meet Owner’s requirements for the Project. <br />5.Prepare a report (the “Report”) which will, as appropriate, contain schematic layouts, <br />sketches, and conceptual design criteria with appropriate exhibits to indicate the agreed-to <br />requirements, considerations involved, and those alternate solutions available to Owner <br />which Engineer recommends. For each recommended solution Engineer will provide the <br />following, which will be separately itemized: opinion of probable Construction Cost; <br />proposed allowances for contingencies; the estimated total costs of design, professional, <br />and related services to be provided by Engineer and its Consultants; and, on the basis of <br />information furnished by Owner, a summary of allowances for other items and services <br />included within the definition of Total Project Costs. <br />6.Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />a. Garland Circle - Provide topographic survey and utility mapping for study and design <br />purposes at Garland Circle, along utility & drainage easement from Garland Circle <br />north to Ridgedale Road. Utility mapping will be based upon information obtained <br />from utility owners, field observations, subsurface utility investigations and as-built <br />plans. Topographic work will be carried out in Indiana Geospatial Coordinate System, <br />St. Joseph projection. Vertical control will be in NAVD 1988 via Opus.