Laserfiche WebLink
BID/PROPOSAL Addendum No. 1 <br />CITY OF SOUTH BEND <br />Project Name: South Bend Neighborhood Infrastructure Project - Riverside Drive <br />and Leland Avenue Intersection <br />Project Number: 121 -048A -R <br />For Bids Due: October 11, 2022 <br />Contractor Name: <br />Base Bid <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />Construction Engineering <br />1 <br />LS <br />$10,035.00 <br />$10,035.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />$46,000.00 <br />$46,000.00 <br />3. <br />Maintenance of Traffic <br />1 <br />LS <br />$52,220.02 <br />$52,220.02 <br />4. <br />Temporary Erosion Control <br />1 <br />LS <br />$65,180.00 <br />$65,180.00 <br />5. <br />Clearing Right of Way <br />1 <br />LS <br />$135,022.00 <br />$135,022.00 <br />6. <br />Pavement Milling <br />4,600 <br />SYD <br />$5.78 <br />$26,588.00 <br />7. <br />Curb, Concrete, Remove <br />820 <br />LFT <br />$20.77 <br />$17,031.40 <br />8. <br />Omitted <br />9. <br />Remove Structure <br />9 <br />EA <br />$1,558.51 <br />$14,026.59 <br />10. <br />Remove Pipe <br />155 <br />LFT <br />$56.24 <br />$8,717.20 <br />11. <br />Brick Pavement, Remove and Salvage <br />200 <br />SYD <br />$35.00 <br />$7,000.00 <br />12. <br />Common Excavation <br />1,435 <br />CYD <br />$0.01 <br />$14.35 <br />13. <br />B Borrow <br />400 <br />CYD <br />$91.12 <br />$36,448.00 <br />14. <br />Structure Backfill <br />110 <br />CYD <br />$36.68 <br />$4,034.80 <br />15. <br />Compacted Aggregate, No. 53 <br />560 <br />TON <br />$50.88 <br />$28,492.80 <br />16. <br />HMA Surface, 9.5 mm, Type B <br />535 <br />TON <br />51-45.81 <br />578.008.35 <br />17. <br />HMA Intermediate, 12.5 mm, Type B <br />395 <br />TON <br />$117.71 <br />$46,495.45 <br />18. <br />HMA Intermediate, 19.0 mm, Type B <br />235 <br />TON <br />$126.00 <br />$29,610.00 <br />19. <br />HMA Base, 25.0 mm, Type B <br />375 <br />TON <br />$111.04 <br />$41,640.00 <br />20. <br />Asphalt for Tack Coat <br />4 <br />TON <br />$704.85 <br />$2,819.40 <br />21. <br />Joint Adhesive <br />4,000 <br />LFT <br />$1.22 <br />$4,880.00 <br />22. <br />Liquid Asphalt Sealant <br />2,000 <br />LFT <br />$0.57 <br />$1,140.00 <br />23. <br />Concrete Curb, 6" <br />825 <br />LFT <br />$37.61 <br />$31,028.25 <br />24. <br />Concrete Header <br />35 <br />LFT <br />$141.22 <br />$4,942.70 <br />25. <br />Concrete Approach, 6" <br />210 <br />SYD <br />$131.19 <br />$27,549.90 <br />26. <br />Concrete Sidewalk, 4" <br />380 <br />SYD <br />$83.96 <br />$31,904.80 <br />27. <br />Concrete Curb Ramp <br />130 <br />SYD <br />$238.11 <br />$30,954.30 <br />28. <br />Sodding <br />1,030 <br />1 SYD <br />$20.40 <br />$21,012.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />