BID/PROPOSAL Addendum No. 1
<br />CITY OF SOUTH BEND
<br />Project Name: South Bend Neighborhood Infrastructure Project - Riverside Drive
<br />and Leland Avenue Intersection
<br />Project Number: 121 -048A -R
<br />For Bids Due: October 11, 2022
<br />Contractor Name:
<br />Base Bid
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1.
<br />Construction Engineering
<br />1
<br />LS
<br />$10,035.00
<br />$10,035.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />$46,000.00
<br />$46,000.00
<br />3.
<br />Maintenance of Traffic
<br />1
<br />LS
<br />$52,220.02
<br />$52,220.02
<br />4.
<br />Temporary Erosion Control
<br />1
<br />LS
<br />$65,180.00
<br />$65,180.00
<br />5.
<br />Clearing Right of Way
<br />1
<br />LS
<br />$135,022.00
<br />$135,022.00
<br />6.
<br />Pavement Milling
<br />4,600
<br />SYD
<br />$5.78
<br />$26,588.00
<br />7.
<br />Curb, Concrete, Remove
<br />820
<br />LFT
<br />$20.77
<br />$17,031.40
<br />8.
<br />Omitted
<br />9.
<br />Remove Structure
<br />9
<br />EA
<br />$1,558.51
<br />$14,026.59
<br />10.
<br />Remove Pipe
<br />155
<br />LFT
<br />$56.24
<br />$8,717.20
<br />11.
<br />Brick Pavement, Remove and Salvage
<br />200
<br />SYD
<br />$35.00
<br />$7,000.00
<br />12.
<br />Common Excavation
<br />1,435
<br />CYD
<br />$0.01
<br />$14.35
<br />13.
<br />B Borrow
<br />400
<br />CYD
<br />$91.12
<br />$36,448.00
<br />14.
<br />Structure Backfill
<br />110
<br />CYD
<br />$36.68
<br />$4,034.80
<br />15.
<br />Compacted Aggregate, No. 53
<br />560
<br />TON
<br />$50.88
<br />$28,492.80
<br />16.
<br />HMA Surface, 9.5 mm, Type B
<br />535
<br />TON
<br />51-45.81
<br />578.008.35
<br />17.
<br />HMA Intermediate, 12.5 mm, Type B
<br />395
<br />TON
<br />$117.71
<br />$46,495.45
<br />18.
<br />HMA Intermediate, 19.0 mm, Type B
<br />235
<br />TON
<br />$126.00
<br />$29,610.00
<br />19.
<br />HMA Base, 25.0 mm, Type B
<br />375
<br />TON
<br />$111.04
<br />$41,640.00
<br />20.
<br />Asphalt for Tack Coat
<br />4
<br />TON
<br />$704.85
<br />$2,819.40
<br />21.
<br />Joint Adhesive
<br />4,000
<br />LFT
<br />$1.22
<br />$4,880.00
<br />22.
<br />Liquid Asphalt Sealant
<br />2,000
<br />LFT
<br />$0.57
<br />$1,140.00
<br />23.
<br />Concrete Curb, 6"
<br />825
<br />LFT
<br />$37.61
<br />$31,028.25
<br />24.
<br />Concrete Header
<br />35
<br />LFT
<br />$141.22
<br />$4,942.70
<br />25.
<br />Concrete Approach, 6"
<br />210
<br />SYD
<br />$131.19
<br />$27,549.90
<br />26.
<br />Concrete Sidewalk, 4"
<br />380
<br />SYD
<br />$83.96
<br />$31,904.80
<br />27.
<br />Concrete Curb Ramp
<br />130
<br />SYD
<br />$238.11
<br />$30,954.30
<br />28.
<br />Sodding
<br />1,030
<br />1 SYD
<br />$20.40
<br />$21,012.00
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7