My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DPW Report to the IPC Board_September_2022
sbend
>
Public
>
Inclusive Procurement and Contracting Board (MBE/WBE)
>
Agendas & Packets
>
2022
>
10-04-2022
>
DPW Report to the IPC Board_September_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2022 2:19:18 PM
Creation date
9/29/2022 2:17:53 PM
Metadata
Fields
Template:
City Council - City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
g. Status: Complete, closeout documents in process <br />h. PCA estimated for October 2022 <br /> <br />24. 2022 Asphalt Materials Bid – Received two (2) bids on 3.22.2022 <br />a. Awarded to Rieth-Riley Construction Co., Inc. on 4.12.2022 <br />b. Contract Goals: <br />i. MBE: 0.13% [met via 1st Class Logistics 0.13%] <br />ii. WBE: 0.18% [met via Montgomery Trucking 0.18%] <br />c. Contract Unit Prices: <br />i. HMA 64-28P Surface: $77/TON <br />ii. HMA 70-22P Surface: $77/TON <br />iii. HMA Binder: $70/TON <br />iv. HMA Base: $49/TON <br />v. CMA Patch: $90/TON <br />vi. Cold Mix: $120/TON <br />vii. Driver & Truck: $122/HR <br />d. PM: Scott Kreeger <br />e. Project Duration (Days): 256 <br /> <br />25. 2022 Contractor Paving, Round 1 – Received two (2) bids on 3.22.2022 <br />a. Awarded base bid and alternate no. 1 to Rieth-Riley Construction Co., Inc. on 4.12.2022 <br />b. Contract Goals: <br />i. Base MBE: 3.92% [met via 1st Class Logistics 4.13%] <br />ii. Base WBE: 5.58% [met via Traffic Control Specialists 2.7%, CE Hughes Milling <br />3.6%, State Barricading 1.1%, Hawk Enterprises, 0.03%] <br />iii. Alt No. 1 MBE: 3.85% [met via 1st Class Logistics 4.1%] <br />iv. Alt No. 1 WBE: 5.48% [met via CE Hughes Milling 7.8%, State Barricading 1%] <br />c. Contract Amount: $1,350,781.84 <br />d. PM: Scott Kreeger <br />e. NTP: <br />f. Project Duration (Days): <br />g. PCA TBD <br /> <br />26. 2022 VPA Athletic Court Renovations – No bids on 4.12.2022 <br />a. Bid award 8/23 to Milestone <br />b. Contract Goals: <br />i. MBE: 1.9% <br />• Met via C Lee, Kennedy Expressline, and 1st Class Logistics <br />ii. WBE: 4.1% <br />• Met via Slusser’s, Shoshone Trucking, V&R Trucking <br />c. Original contract amount: $1,594,948.33 <br />d. PM: Zach Hurst
The URL can be used to link to this page
Your browser does not support the video tag.