Laserfiche WebLink
b. Contract Goals: <br />i. MBE: 4.0% [met via V&R Trucking $31,165.48 (4.08%)] <br />ii. WBE: 6.0% [met via CE Huges Milling $38,956.85 (5.1%) and Traffic Control <br />Specialists $7,944.14 (1.04%)] <br />c. Contract Amount: <br />i. Awarded: <br />ii. Current: $1,233,256.59 <br />d. PM: Scott Kreeger <br />e. Deduct due to underrun of the work, may need goal waiver. <br />f. PCA estimated September 2022 <br /> <br />7. SBPD Roof Rehabilitation <br />a. Awarded on 10/26/2021 to Midland Engineering <br />b. Contract Goals: <br />i. MBE: 0.6% <br />• Met with JHM Roofing (0.6%) <br />ii. WBE: 2.1% <br />• Met with JHM Roofing (2.1%) <br />c. Contract Amount: $1,268,400 Awarded <br />d. PM: Leslie Biek <br />e. Project Duration: Completed 7/28/2022 <br /> <br />8. VPA Athletic Court Renovations, Phase 1 <br />a. Awarded on 9/28/21 <br />b. Contract Goals: <br />i. MBE: 2.6% <br />• V&R Trucking ($1,275 or 1.35% of orig. contract) <br />• C Lee Constr. ($1,275 or 1.35% of orig. contract) <br />• After C.O #1, MBE will not be met: 2.43% <br />ii. WBE: 5.0% <br />• Slusser’s ($4,294.84 or 4.41% of orig. contract) <br />• KB Enterprises ($1,732.40 or 1.78% of orig. contract) <br />c. Contract Amount: <br />i. Awarded: $97,474.84 <br />ii. Current$105,044.84 <br />d. PM: Zach Hurst <br />e. NTP: 4/5/22 <br />f. Project Duration: 150 days <br />g. May need a goal waiver, almost ready to close out – still no verification in B2Gnow <br /> <br />9. Potawatomi Zoo Parking Lot Expansion <br />a. Awarded on November 23, 2021