Laserfiche WebLink
QUOTE TABULATION <br />Sheridan Riverside Parking Lane Resurface <br />122-056 <br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost <br />1 Maintenance of Traffic 1 LS $7,722.54 $7,722.54 $27,000.00 $27,000.00 <br />2 Mobilization and Demobilization 1 LS $7,722.54 $7,722.54 $7,700.00 $7,700.00 <br />3 Milling, 4"2,836 SY $4.00 $11,344.00 $24.00 $68,064.00 <br />4 HMA Surface, 9.5 mm - Type B 312 TONS $105.00 $32,760.00 $173.00 $53,976.00 <br />5 HMA Intermediate, 12.5 mm - Type B 312 TONS $91.35 $28,501.20 $215.00 $67,080.00 <br />6 Tack Coat 2 TONS $1,072.00 $2,144.00 $10.00 $20.00 <br />7 Join Adhesive, Surface 2,000 LF $1.24 $2,480.00 $3.00 $6,000.00Total$92,674.28 $229,840.00 <br />I hereby certify that the above truly and accurately represents bids received for this project on September 13, 2022 <br />Scott Kreeger, Project Engineer <br />Engineer's Estimate Rieth-Riley Construction Co., Inc. <br />Non-Collusion Affadavit Yes <br />S:\Public Works\Projects\Projects by Year\2022 Projects\122-056 Sheridan St & Riverside Dr Parking Lane Resurface\1 - Admin\1 - BPW Documents\122-056 Quote Tabulation