My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos 1-3 - Olive Street Reconstruction Phase II Proj No. 114-064 - INDOT Milestone
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order Nos 1-3 - Olive Street Reconstruction Phase II Proj No. 114-064 - INDOT Milestone
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 11:33:18 AM
Creation date
9/27/2022 11:33:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/27/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -43125 INDIANA Date:09/12/2022 <br />Change Order No:001 Department of Transportation Page: 3 <br />Contract:R -43125 <br />Project:1902178 - State:190217800LC4 <br />Change Order Nbr: 001 <br />Change Order Description: Material change due to small contract quantity <br />Reason Code:SCOPE CHANGES, Material Related <br />CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change <br />0030 1902178 0030 501-06321 SYS 83.000 -1760.000 C Amount:$ -146,080.00 <br />Item Description:QC/QA-PCCP, 10 IN. <br />Supplemental Description1: <br />Supplemental Description2: <br />Total Value for Change Order 001 = $ -146,080.00 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />Because of the small quantity of pavement concrete needed on this project (1,760. sys), request was made to change material from 501 to 502 <br />mix and INDOT agreed with the change. CO #1 is to remove CLN/PLN item 30 QC-QA PCCP, 10 inch. <br />Change Order Explanation for Specific Line Item <br />**************************************************************************************************************************** <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor:____________________________________________Signed By:_____________________________________________ <br />Date:__________________________________________________ <br />*************************************************************************************************************************** <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
The URL can be used to link to this page
Your browser does not support the video tag.