My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order Nos 1-3 - Olive Street Reconstruction Phase II Proj No. 114-064 - INDOT Milestone
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order Nos 1-3 - Olive Street Reconstruction Phase II Proj No. 114-064 - INDOT Milestone
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 11:33:18 AM
Creation date
9/27/2022 11:33:11 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/27/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENVIRONMENTAL SERVICES <br /> <br /> <br />TO: Board of Public Works <br />Theresa Heffner, Clerk <br />FROM: Leslie Biek, P.E., Assistant City Engineer <br />SUBJECT: Change Order # 1-3 <br />Olive St Rehabilitation Ph 2 (PN 114-064) <br />DATE: 9/13/2022 <br />Attached are change orders 1-3 for the Olive St Rehabilitation Project (PN 114-064). <br /> <br />Original Contract Amount: $655,280.20 <br />Previously Approved change orders: $0 <br />Percent increase including request: 0.789% <br />New Contract Amount: $660,447.85 <br /> <br />Change order #1: is for the removal of the concrete material that was in the bid specifications. <br />Decrease amount: -$146,080.00 <br /> <br />Change order #2 is for the additional of a different concrete material due to the small quantity of <br />pavement needed for this project. <br />Increase amount: $146,080.00 <br /> <br />Change order #3 is to remove and replace 5 castings due to their existing condition. The original <br />plan was to adjust to grade. <br />Increase amount: $5,167.65 Total ($1,033.53 Local) <br />Total percent increase: 0.789% <br />Revised contract amount $660,447.85 <br /> <br />As this is a federal aid project, INDOT is responsible for the construction contract with Milestone. <br /> <br />It is requested the Board of Public Works approve Change Orders 1-3 for the Olive St <br />Rehabilitation Ph 2 project (PN 114-064) for a total increase of $5,167.65 (Local share of <br />$1,033.53) which is a total increase of 0.789% to the contract price bringing the new <br />contract price to $660,447.85. <br /> <br />Thank you for your consideration of this request. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.