My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Installation of School Zone Flashing Beacons Proj No. 117-075 - Michiana Contracting, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Change Orders
>
Change Order No 2 - Installation of School Zone Flashing Beacons Proj No. 117-075 - Michiana Contracting, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2022 11:33:10 AM
Creation date
9/27/2022 11:33:06 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/27/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:T -41189 INDIANA Date:09/20/2022 <br />Change Order No:002 Department of Transportation Page: 3 <br />Contract: T -41189 <br />Project: 1801240 - State:180124000LC4 <br />Change Order Nbr: 002 <br />Change Order Description: Additional Flashing Beacons for stock <br />Reason Code: SCOPE CHANGES, Added Quantities/Items <br />CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change <br />0022 1801240 0022 805-06742 EACH 4,727.490 5.000 C Amount:$ 23,637.45 <br />Item Description:SOLAR POWERED FLASHING BEACON ASSEMBLY <br />Supplemental Description1: School zone flashing beacon with applied time & monitoring <br />Supplemental Description2: <br />0023 1801240 0023 805-11771 EACH 1,276.000 5.000 C Amount:$ 6,380.00 <br />Item Description:SIGNAL POLE PEDESTAL 16 FT <br />Supplemental Description1: Pedestal base cap <br />Supplemental Description2: <br />Total Value for Change Order 002 = $ 30,017.45 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The City of South Bend has requested an additional 5 flashing beacons with the intention of replacement parts for potential knockdowns and <br />unforeseen damages. These 5 beacons will be a non-participating item as it is outside the original scope of the project and will be funded by the <br />City. The INDOT PM is aware of the change and has given concurrence <br />Change Order Explanation for Specific Line Item <br />**************************************************************************************************************************** <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor:____________________________________________ Signed By:_____________________________________________ <br />Date:__________________________________________________ <br />*************************************************************************************************************************** <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
The URL can be used to link to this page
Your browser does not support the video tag.