My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10865-22 Amending System Development Charges within Various Sections of Chapter 17, Article 10 of the South Bend Municipal Code
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
2022
>
10865-22 Amending System Development Charges within Various Sections of Chapter 17, Article 10 of the South Bend Municipal Code
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2023 1:34:07 PM
Creation date
9/19/2022 2:26:35 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
6/27/2022
Ord-Res Number
10865-22
Bill Number
29-22
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> (4) (3) - . . - .. .. . , - . - •. . , —;; - .. <br /> • - ' . For all ether non-residential types <br /> of structures, the ERU calculation shall be based upon the : • <br /> . . • :- `:' - <br /> water and sewer use values provided in 327 IAC 3-6-11 in <br /> divided by three hundred ten(310) gallons per day. For structures not listed <br /> in 327 IAC 3-6-11, the ERU shall be calculated as described by in the Board of Public <br /> Works Resolution No. 20-2017. -- - . • • . . -• -- • _ `.• - - -- . <br /> flay:For mixed use structures, which include residential and non-residential units, the ERU <br /> calculation shall be based on the addition of the number of residential units and the water <br /> and sewer use values provided in 327 IAC 3-6-11 for the non-residential units. <br /> (44) For parcels with an existing connection to City water seeking to redevelop the property, a <br /> System Development Charge will be collected if the redevelopment necessitates a larger <br /> water meter size to accommodate increased flow. The System Development Charge will <br /> be calculated using meter size equivalency factors shown below. The difference between <br /> the existing meter size equivalency factor and new meter size equivalency factor will be <br /> collected. For example, if the existing development on a parcel has a 5/8 in meter, and the <br /> new development will require a 1 in meter, the SDC will be $1,187.50 (SDC for 1 in) - <br /> $475 (SDC for 5/8 in) = $712.50. There will not be a credit given if the meter size is <br /> reduced. Existing water tap size will be used if the meter size is not available. Upon <br /> application for construction, the new meter size will need to be determined. <br /> Meter Size Equivalency Factor SDC Charge <br /> 5/8 in. 1.0 $475 <br /> 3/4 in. 1.5 $712.50 <br /> 1 in. 2.5 $1,187.50 <br /> 1 '/z in. 5.0 $2,375 <br /> 2 in. 8.0 $3,800 <br /> 3 in. 15.0 $7,125 <br /> 4 in. 25.0 $11,875 <br /> 6 in. 50.0 $23,750 <br /> 8 in. 80.0 $38,000 <br /> 10 in. 115.0 $54,625 <br /> (5) For residential infill developments of five (5) or fewer residential units per parcell the <br /> System Development Charge shall be waived. For residential infill development of five (5) <br /> units or more, whether developed at one time or over a period of time, the System <br /> Development Charge shall be waived for infill residential housing units constructed by not- <br /> for-profit development companies or supported by low-income housing tax credits. <br /> -- , -- ' . -. . .• . . . •. . .• <br /> .•. -- ►•. e: - <br /> • <br /> O .A. . . _ . - •• - - . - • .. . _ . - . <br /> • - • ' • <br />
The URL can be used to link to this page
Your browser does not support the video tag.