Laserfiche WebLink
(5) Residential unit is any single-metered free-standing independent structure primarily used as a <br /> dwelling unit for one household. <br /> (6) System Development Charge("SDC") is the cost charged by the City to ensure that its water <br /> and sewer facilities are able to support development and to meet future capacity demand. <br /> An SDC C is charged upon the connection of new customers to the City's water or sewer <br /> utilities and new uses by existing customers that would materially change the demands on <br /> the water and/or sewer utility. <br /> Sec. 17-7.9 79.1. System Development Charge for Wastewater inside and outside City limits. <br /> - - - • <br /> gallons-per-day. No customer will be less than one (1) ERU. There will be no partial ERU's. <br /> The City shall round down to the closest applicable ERU calculation at all times. <br /> (2) - - . - : •- _ . . - •. - .-,fer For every new connection <br /> to the South Bend Municipal Sewer Works, a system development charge of one thousand <br /> one hundred forty-five dollars ($1,145.00) shall be collected per ERU <br /> All charges shall be billed by the City at the time the application <br /> for service is filed. <br /> (3} _ - . . -- - • - - . - ' _ • . . . . - -- - - ' , - .. <br /> f43 (3) - . . ' . . . . _., . .. .. • , . .. • . . - , - ..• . -- <br /> . .. ' -. For all ether non-residential types <br /> of structures, the ERU calculation shall be based upon the <br /> water and sewer use values provided in 327 IAC 3-6-11 ii <br /> relationship to divided by three hundred ten(310) gallons per day. For structures not listed <br /> in 327 IAC 3-6-11, the ERU shall be calculated as the relationship between the Average <br /> Daily Flow reported in the sewer capacity certification for the structure and three hundred <br /> ,M1~(310)gallons per day. described in the Board of Works Resolution No. 20-2017. <br /> For mixed use structures, which include residential and non-residential units, the ERU <br /> calculation shall be based on the addition of the number of residential units and the water <br /> and sewer use values provided in 327 IAC 3-6-11 for the non-residential units. <br /> (4) For parcels with an existing connection to City sewer seeking to redevelop the property, a <br /> System Development Charge will be collected if the redevelopment necessitates a larger water <br /> meter size to accommodate increased flow. The System Development Charge will be <br /> calculated using meter size equivalency factors shown below. The difference between the <br /> existing meter size equivalency factor and new meter size equivalency factor will be collected. <br /> For example, if the existing development on a parcel has a 5/8 in meter, and the new <br /> development will require a 1 in meter, the SDC will be $2,863 (SDC for 1 in) - $1,145 (SDC <br /> for 5/8 in) = $1,718. There will not be a credit given if the meter size is reduced. Existing <br /> water tap size will be used if the meter is not available. Upon application for connection, the <br /> new meter size will need to be determined. <br />