Laserfiche WebLink
3 <br />PERMIT BRIEFING MEMO <br />1. Facility Description <br />Pioneer Metal Finishing (Pioneer) is a job shop and operates on one shift, 10-12 hours per <br />day, on a seven day per week period. Pioneer engages metal finishing activities including <br />anodizing and electroless nickel plating of customer supplied parts, as well as <br />masking/painting, and chem film. Chemicals utilized in Pioneer’s processes include <br />various dyes, seals, sulfuric acid, nitric acid, hydrochloric acid, caustic soda, nickel <br />acetate, PTFE, Alodine, alkaline soaps, and electroless nickel solution. <br /> <br />2. Discharge description: <br />Discharge to Sample Site # 323 (A&B) is metal finishing process water combined with <br />boiler blowdown and non-contact cooling water. Boiler blowdown discharge is minimal <br />at 5 gallons per day. Non-Contact Cooling water amounts change seasonally. Pioneer <br />uses RO treated water in process lines and channels the RO backwash to a process rinse <br />tank. <br />Metal finishing wastewater originates at each of the rinse tanks which are situated <br />between process tanks. Since Pioneer is a job shop, volume of discharge can vary <br />significantly. <br />From January 1, 2021 to May 31, 2022 <br />Wastestream Average gpd Max gpd <br />Non-Contact Cooling Water 303 1,500 <br />Total Flow 18,827 78, 357 <br />3. Sample Site Description <br />Sample Site # 323 B is located inside the main facility after the indoor final weir tank on <br />the west wall of the wastewater treatment room. Wastewater goes through the weir tank <br />for flow measurement prior to discharge. Grab samples are collected from the flow out of <br />the weir tank, and 24-hour composite samples are collected from the final discharge pipe <br />after the weir tank. <br />Pioneer requested to move the monitoring point indoors in the letter dated September 12, <br />2020. Pioneer commissioned “Bob Frame Plumbing” to camera the line between the <br />Sample Site Outfall # 323 A and #323 B and certify that there were no inlets between the <br />monitoring points. <br />The location of Sample Site Outfall # 323 A is an outdoor manhole on the west side of <br />the building and south of the outside door to the production area. The Control Authority <br />requires Pioneer to maintain this sample site including the flowmeter cable for <br />unannounced monitoring if the Control Authority deems it necessary. The Control <br />Authority reserves the right to re-institute the Sample Site Outfall #323 A as Pioneer’s <br />only sampling location if deemed appropriate. <br /> <br /> <br /> <br />