My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sewer & Water Extension Agreement & Title Sheet - Utility Extension for Campus View - UND Property Owner, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2022
>
Agreements/Contracts/Proposals/Addenda
>
Sewer & Water Extension Agreement & Title Sheet - Utility Extension for Campus View - UND Property Owner, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2022 1:57:36 PM
Creation date
9/13/2022 1:56:43 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
attendance of a City inspector at key milestones throughout work. Key milestones shall include <br />but not be limited to: water main construction, sewer main construction, water main <br />abandonment, mandrel deflection testing, sanitary sewer taps, and water main taps. The Owner <br />agrees to perform any necessary adjustments as reasonably requested by the City to ensure the <br />Dedicated Improvements are constructed in accordance with Exhibit A. <br />4. Permits <br />It shall be Owner’s sole responsibility and expense to obtain any and all permits associated <br />with the construction and installation of the Dedicated Improvements and to comply with all <br />applicable laws. <br />5. Engineer’s Opinion of Probable Construction Cost <br />The Owner has provided an Engineer’s Opinion of Probable Construction Cost (See Exhibit <br />B, incorporated herein by reference and attachment) for the cost to construct the water main and <br />sanitary sewer main portion of the Dedicated Improvements, including but not limited to, <br />excavation, pipe materials, valves, hydrants, and all other appurtenant materials, supplies and <br />equipment, permit fees, backfill and bedding, pavement, curbs, sidewalks, signs, and restoration <br />of the areas within the proposed R.O.W. <br />6. Performance Bond <br />Owner shall provide the City with a performance bond for an amount equal to one hundred <br />twenty–five percent (125%) of the Engineer’s Opinion of Probable Construction Cost. Owner’s <br />failure to provide the performance bond as prescribed herein shall cause this Agreement to be <br />immediately terminated and of no effect, without the requirement of notice. The performance <br />bond shall be provided concurrently with the execution of this Agreement and attached Exhibit C.
The URL can be used to link to this page
Your browser does not support the video tag.