Laserfiche WebLink
FEE JUSTIFICATION EXHIBIT <br />DIRECT NON-SALARY COSTS - CE <br />City of South Bend <br />Coal Line Trail Phase IIB <br />Railroad Bridge Rehab and Trail Construction <br />B-44292 <br />TRAVEL <br />ASSUMPTIONS <br />No. of Trips (1. Person/Day)1.5 Per Day 1. (1.5 Average) person inspection team <br />Days/Week 5 Per Wk 2. 11 Months (44 Wks) Construction Period <br />Wk/Construction 44 Wks <br />Total Trips 330 Trips <br />A.Miles to Site (50 Miles/Each Way)33000 Miles <br />Miles at Site ( Est. 10 Mile Per Day)10 Miles <br />No. of CPM/Inspectors 1.5 <br />Days/Week 5 Per Wk <br />Wk/Construction 44 Wks <br />B.Total Site Mileage 3300 Miles <br />Total Mileage (A. + B.)36300 Miles 0.49 Mileage Rate 17,787.00 <br />Per Diem (1 Individuals)0 Days 30.00 Per Day 0.00 <br />Lodging ( Apts)0 Months 1,350.00 Per Day 0.00 <br />Motel Cost - Double 0 Days 101.00 Per Day 0.00 <br />17,787.00 <br />PRINTING <br />Shts./Set Sets Cost/Sht. <br />Signage 0 0 50.00 0.00 <br />Copies 0 0 0.10 0.00 <br />0.00 <br />MISCELLANEOUS <br />UAS Construction Surveillance, Earthwork Calculations, and Storm Water Management 0.00 <br />Printer 0.00 <br />Material Testing Consultant - LWD, Concrete 0.00 <br />Survey Marking Paint and Supplies 0.00 <br />43,500.00 <br />WBE Subconsultant <br />VBE Subconsultant <br />43,500.00 <br />DIRECT NON-SALARY TOTAL - CE 61,287.00 <br />CLIENT: <br />PROJECT NAME: <br />PRINTING TOTAL: <br />MISCELLANEOUS TOTAL: <br />TRAVEL TOTAL: <br />2200199 <br />MISCELLANEOUS COSTSPROJECT DESCRIPTION: <br />PROJECT NO: <br />DES NO: <br />DATE:TRAVEL COSTSPRINTINGDBE Subconsultant (McCormick Engineering 10%) <br />09/01/22 <br />USI CONSULTANTS, INC.DIRECT NON-SALARY COSTS - CE PAGE 1 of 1